G GA-RWA-EDGE
Atlanta & Georgia · Real-World Asset Tokenization · Edge Data Centers

Institutional RWA rails for Atlanta & Georgia edge data centers, AI compute hosting, and Qualified Rural Opportunity Zone equity. Non-custodial. Compliance-gated at the wire, not audited after.

GA-RWA-EDGE is the four-entity operating stack for tokenizing power-anchored edge compute and hospitality assets — every dollar routes through a bankruptcy-remote Site SPE, every claim maps to an on-chain attestation, and every fee is a named line item. This is what serious accredited investors, family offices, and senior lenders expect from an RWA program in 2026.

GA-RWA-EDGE architecture: modular pods, PPA-anchored power, ERC-3643 on-chain layer, four-entity capital stack
27
Solidity contracts compiling clean
4
Entity operating stack
30%
Rural QROF basis step-up (2027+)
50%
Rural OZ substantial-improvement floor
$25M
USDA B&I max per project
17
Deterministic underwriting calculators

A four-entity stack that keeps every counterparty on the right side of the line

Senior lenders demand a clean SPE borrower. Securities regulators want issuance under exemptions and a registered BD doing only BD things. Investors want qualified custody. Sponsors want equity carry without direct operational risk. The stack below satisfies each of them separately.

Unykorn LLC

Technology rails

27 Solidity contracts (ERC-3643 · ERC-7540 · ERC-7575) that enforce identity verification, AML travel-rule gates, m-of-n attestation, and waterfall priorities before value can move. Non-custodial by construction. Fee revenue only.

LD Capital LLC

Issuance & QOF/QROF admin

Reg D 506(c) and Reg S offerings, servicing, and Qualified Opportunity Fund / Qualified Rural Opportunity Fund administration. CPA-attested 90% asset test filings. Rule 144 opinion of counsel on every tokenized security.

FTH Trading

Markets · BD track · LDX

Stage 1: BD-of-record partnership. Stage 2: own FINRA broker-dealer. Stage 3: LDX-as-ATS registered under Form ATS. Distribution, secondary trading, and eventual venue economics all live here — never in Unykorn or LD.

Asset SPEs

Bankruptcy-remote borrowers

One SPE per site or asset. Holds land, PPA rights, modular pods, hosting contracts, equipment titles. Conduits with no other business. Every senior lender interfaces with a clean single-purpose entity.

The rule that makes it fundable Money never sits in Unykorn or FTH. Assets live only in Site SPEs. Every claim in this repository maps to a receipt at one of these four entities.

Barak/Brock — rural North Georgia PPA-anchored candidate site (Phase 0)

Barak/Brock is a rural North Georgia candidate site in negotiation for acquisition and RWA-rail conversion. Site facts below are per operator and subject to Phase 0 diligence verification before any subscription document, credit application, or capital-markets narrative can rely on them. The four-state Phase 0 fork determines whether this becomes a RUNNING acquisition (seasoned NOI) or a DARK-SHELL acquisition (PPA-assignment asset + reactivation budget).

Per operator · Phase 0 pending

Site facts as represented

LocationRural North Georgia (candidate)
Contracted load5 MW (per operator)
Existing use~721 bitcoin miners (per operator, count subject to fleet audit — nameplate reconciliation open)
PPA rate4.9¢/kWh (per operator)
Regulatory postureGeorgia — regulated electricity market. Large-load carve-out applicability (>900 kW under Territorial Act) subject to site/supplier confirmation.
Gas hedge availabilityContingent on AGL (Atlanta Gas Light) delivery territory — site-specific verification required.
OZ classificationRural OZ tract (subject to OBBBA rural-test verification)
Site operating statusPhase 0 pending — RUNNING vs DARK-SHELL fork unresolved

See the Atlanta market page for the Metro Atlanta AI compute vertical, and the Phase 0 fork document for the diligence path.

Phase 0 diligence gate

Four hard-gate inputs required before Phase 1

  1. PPA status — LIVE / DORMANT / TERMINATED. Determines the RUNNING vs DARK-SHELL fork.
  2. Miners on site — YES-ALL / YES-PARTIAL / NO. Determines the ~721-unit representation.
  3. Consent to pledge or assign the receivable — separate from assignment consent. Phase 4 tokenization halts without this.
  4. Territorial Act carve-out application — confirmed at PSC / supplier level for this specific premise.

Repeatable — the same rails scale to N locations

Every site follows the same construction: bankruptcy-remote Site SPE takes title / PPA assignment · Unykorn rails wire identity + attestation + waterfall · LD Capital issues QROF or QOF equity · FTH Trading distributes to accredited investors. Each site produces contracted hosting revenue, waterfall distributions, and — for rural QROF sites — 30% basis step-up equity.

Phase 0 · candidate

GA-BARAK-01 · rural North Georgia

Candidate acquisition — 5 MW / 4.9¢ PPA / ~721 miners per operator. First rural-QROF conversion candidate targeting AI-hosting anchor tenant. Site status pending Phase 0 diligence.

Pipeline

North Georgia rural

White · Rabun · Union · Fannin counties. Definitively rural for QROF 30% step-up. Blue Ridge EMC + TVA-adjacent hydro.

Pipeline

Metro ring counties

Coweta · Clayton · Jackson · Newton · Douglas · Carroll. Outer tracts pending 2027 QROF map certification.

Border expansion

TVA · SW Virginia · Upstate SC

Tennessee River Valley (cheapest US industrial rates). Southwest Virginia (PJM SREC compliance market). Rural upstate SC (Duke Energy).

Documentation, downloads, and calculators

Every claim on this page is backed by a specific document. All documents are downloadable as PDF. All formulas are implemented in deterministic Python. All contracts compile clean under solc 0.8.36.

Client-facing PDFs

Intake · diligence

Client Requirements & Diligence Guide

What we need from you (entity, site, power, offtake, financials). What you should demand from us. Specifics to read closely.

Site

Rural QROF Site Screen

OZ 2.0 tract eligibility, statutory rural test, county ordinance screen, zoning verification letter workflow.

Energy

Georgia Energy Playbook

Voluntary-only SREC market · solar/wind ITC cutoff status · gas-hybrid attestation · PSC posture for sub-5 MW loads.

EPC

Modular EPC 12-Clause Review

Counsel + PM sign-off sheet. Hard fails on scope, milestones, commissioning gates, lender assignment.

PPA

PPA 12-Item Scored Diligence

Go/No-Go scoring pack. Zero tolerance on credit, term, pricing, attribute ownership. Priority-1 utility discipline.

Commissioning

FAT / SAT / IST Certificate

Three test gates. Each certificate hash-anchored on-chain via ReserveProofAnchor.

Operations

Operational Metrics Spec

PUE targets (≤1.15 site · 1.03–1.10 immersion), carbon intensity, DSCR feed format for DSCRTrigger.

Integration

RWA Rails Integration Schemas

EIP-712 attestation struct · document-anchor docType set · period waterfall signal with Priority-1 utility amount.

Calculator suite (Python, deterministic, dependency-free)

Tax & incentives

QROF · MACRS + bonus · §179 · TREX

QROF 10%/30% step-up. MACRS 5/7/15/39-yr with 100% bonus. §179 with 2026 phase-out. Partnership Flip 99/1 → 5/95. Combined stacker for one-call totals.

Deal underwriting

PPA-aware capital stack · DSCR · scorers

Senior LTV scaled by PPA score. DSCR tested net of PPA demand charges. PPA 12-item auto-scorer. Rural QROF screener. Site scorecard. Interconnect feasibility.

What clients should look for — the 10 items that separate real platforms from marketing

If a platform you're evaluating cannot answer each of these in one sentence with a specific reference, they haven't built what they claim.

  1. Show me the code — inspectable contracts with published mainnet addresses. Marketing sites describing nonexistent systems are the industry's #1 red flag.
  2. Who holds the keys — qualified custody, model named. Our target: 2-of-3 with client holding one key; platform can never move alone.
  3. Where money sits pre-close — bank / trust escrow only, never a platform operating account. Never send subscription funds to a "platform wallet."
  4. Explicit fees — every fee a named bps or dollar line. Opaque spreads are unauditable fees.
  5. No promised returns — guaranteed yield, SBLC "monetization," or upfront release fees = walk away.
  6. Licenses verified — issuers may sell their own paper (506(c)); anyone selling others' securities for compensation must be a registered BD (check FINRA BrokerCheck).
  7. Registry-backed ESG — a REC or carbon credit without a tracking-registry serial is a story, not an asset. Our contracts refuse to mint without one.
  8. Compliance as a gate — an unverified wallet must be structurally unable to receive tokens. Enforcement before movement, not review after.
  9. Reproducible math — waterfall distributions reconcile to an independent model to the cent.
  10. Engineered downside — DSCR triggers, cash traps, loss order, and key-recovery answers should be crisp.

For accredited investors

Access the investor portal Verified-accredited investors (Reg D 506(c)) receive access to the full deal book — Barak 5 MW deal facts, capital stack sizing, subscription mechanics, tax analysis, and the introductory offer. Verification via Persona / Parallel Markets before portal access.
Pre-mainnet blockers · what this is / what this is not This repository IS: scaffolding + seeds. Compilable Solidity (27 files, solc 0.8.36, EVM Cancun). Institutional-quality documentation. Georgia-specific configuration seeds.

What it IS NOT yet: production-deployable securities infrastructure.

Pre-mainnet blockers: dual independent audits · securities counsel Rule 144 opinion · legal SPV package behind every ReserveProofAnchor · BD registration or BD-of-record · BitGo Bank & Trust N.A. (or Anchorage) custody engagement · CPA administrator for QOF 90% asset test.

Nothing here is an offer to sell securities. Not legal, tax, or investment advice.