Tier 1 — Live and pipeline
GA-BARAK-01 · Atlanta market
Per operator (Phase 0 pending): 5 MW load · 4.9¢/kWh fixed PPA · ~721 miners represented on site. AGL gas-hedge optionality contingent on delivery territory. Site status subject to Phase 0 diligence verification.
| Load | 5 MW baseline |
| Rate | 4.9¢/kWh fixed |
| Annual power | $2,146,200 |
| Site status | Energized |
| Path | Path B rural QROF (tract TBD) |
| Target project | $20,000,000 |
White County · Helen corridor
Definitively rural for QROF 30% step-up. Cooperative county commissioners. Blue Ridge EMC + Georgia Power rural distribution. Multiple OZ-eligible tracts.
| Target load | 3-5 MW modular pods |
| Power path | EMC + GA Power |
| Rural QROF | Confirmed |
| Timing | 2027-2028 |
Jackson / Barrow · I-85 corridor
I-85 corridor with Atlanta / Charlotte fiber access. Jackson EMC + Georgia Power. Outer tracts likely rural-qualifying for QROF (verify against Atlanta urbanized area).
| Target load | 5-10 MW |
| Fiber | ATL / CLT PoP |
| Rural QROF | Verify per tract |
| Timing | 2027-2028 |
Tier 2 — Metro ring counties (screen per tract)
| County | Status | Notes | Rural QROF? |
|---|---|---|---|
| Coweta (Newnan corridor) | BEST | Industrial overlay welcoming. Coweta-Fayette EMC. Outer tracts (far south, well away from Newnan urbanized fringe) likely qualify. | Verify per tract |
| Clayton (Jonesboro corridor) | BEST | Major Georgia Power sub-transmission feeds. Industrial-friendly zoning. Best latency to central Atlanta AI demand. | Entirely inside Atlanta urbanized area — not rural |
| Newton (east of Covington) | YES with letter | East metro. Screen ordinance individually. Outer tracts likely rural-qualifying. | Outer tracts only |
| Rockdale | YES with letter | East metro. Screen individually. | Verify per tract |
| Douglas | YES with letter | West metro. Some hyperscale interest (Meta area). Most inside urbanized area. | Most tracts fail |
| Carroll | YES with letter | West metro. Outer tracts west of Carrollton likely rural. | Outer tracts only |
Tier 3 — Definitively rural Georgia
North Georgia mountains
White · Rabun · Union · Fannin · Habersham · Hart · Franklin · Elbert. Definitively rural. TVA-adjacent hydro / Blue Ridge EMC. Fiber weaker — plan build-out.
South Georgia agricultural corridor
Bulloch · Emanuel · Jefferson. Rural. Georgia Power + strong solar potential. Savannah PoP proximity. Lowest land basis in the state.
Border expansion — TVA · SW Virginia · Upstate SC
Tennessee River Valley (E TN · N AL · N MS)
Cheapest US industrial rates. Rural QROF-eligible in many tracts. TVA structure supports large-scale industrial development. Fiber via Chattanooga / Huntsville / Muscle Shoals PoPs.
Southwest Virginia
Access to PJM compliance-market SREC pricing (vs. GA voluntary-only). Deep rural QROF stack. Appalachian Power territory. Nearest metro: Roanoke / Tri-Cities.
Rural upstate South Carolina
Charlotte AI-cloud demand overflow. Duke Energy Carolinas. Rural upstate counties (Cherokee, Union, Chester, Laurens) hold QROF-eligible tracts.
Do NOT deploy (jurisdictional bans)
DeKalb County: Active moratorium on data-center use.
Fayetteville / South Fulton: Restrictive ordinance activity 2025-26.
Palmetto: Municipal restrictions.
The Path B rural QROF strategy exists precisely to avoid these jurisdictions while remaining within Georgia Power delivery capability.
Site selection discipline — the 7-step screen
- PPA / power path first · locked PPA rate + assignability language + utility posture on novation. No power path, no deal.
- Zoning verification letter · written letter from county zoning official confirming data-center use is permitted, before any option agreement.
- Rural QROF tract test · pull tract ID from 2020 Census. Confirm no city / town > 50k population within tract and no urbanized-area contiguity. Verify against 2027 map when certified.
- Site control on option, not purchase · option agreement pre-Jan 1, 2027 to preserve OZ deployment discipline. Purchase closes at deal close.
- Fiber diligence · minimum 2 carrier options. Latency to Atlanta / Dallas / Charlotte AI-cloud PoPs.
- Water + climate · immersion needs modest but nonzero water. Ambient design temp per NOAA design-day data.
- Community engagement · show up at county EDC early with jobs + tax base story. This is how you convert "yes with letter" jurisdictions into "best."
Multi-site portfolio economics
Every additional site on the same rails compounds three ways:
- Fixed cost amortization — legal, custody, and rail-configuration costs are largely fixed per fund vehicle. Second site adds ~$50k of incremental setup vs. $500k for site one.
- Seasoned book graduation — after 6-12 months of clean payment history across 3-5 sites, the note book qualifies for Centrifuge V3 warehouse leverage at 70-90% advance rate on senior tranche.
- Diversification — multiple sites reduce single-tenant concentration and single-PPA counterparty risk that Applied Digital / CoreWeave-style deals concentrate.