GGA-RWA-EDGE
Locations · Georgia · TVA · SW Virginia · Upstate SC

The same rails scale across multiple sites — one Site SPE per parcel, all sharing the four-entity operating stack.

Every site follows the same construction. Bankruptcy-remote Site SPE takes title / PPA assignment. Unykorn rails wire identity, attestation, and waterfall. LD Capital issues QROF or QOF equity. FTH Trading distributes to accredited investors.

Tier 1 — Live and pipeline

LIVE · Site 1

GA-BARAK-01 · Atlanta market

Per operator (Phase 0 pending): 5 MW load · 4.9¢/kWh fixed PPA · ~721 miners represented on site. AGL gas-hedge optionality contingent on delivery territory. Site status subject to Phase 0 diligence verification.

Load5 MW baseline
Rate4.9¢/kWh fixed
Annual power$2,146,200
Site statusEnergized
PathPath B rural QROF (tract TBD)
Target project$20,000,000
Pipeline · Site 2

White County · Helen corridor

Definitively rural for QROF 30% step-up. Cooperative county commissioners. Blue Ridge EMC + Georgia Power rural distribution. Multiple OZ-eligible tracts.

Target load3-5 MW modular pods
Power pathEMC + GA Power
Rural QROFConfirmed
Timing2027-2028
Pipeline · Site 3

Jackson / Barrow · I-85 corridor

I-85 corridor with Atlanta / Charlotte fiber access. Jackson EMC + Georgia Power. Outer tracts likely rural-qualifying for QROF (verify against Atlanta urbanized area).

Target load5-10 MW
FiberATL / CLT PoP
Rural QROFVerify per tract
Timing2027-2028

Tier 2 — Metro ring counties (screen per tract)

CountyStatusNotesRural QROF?
Coweta (Newnan corridor)BESTIndustrial overlay welcoming. Coweta-Fayette EMC. Outer tracts (far south, well away from Newnan urbanized fringe) likely qualify.Verify per tract
Clayton (Jonesboro corridor)BESTMajor Georgia Power sub-transmission feeds. Industrial-friendly zoning. Best latency to central Atlanta AI demand.Entirely inside Atlanta urbanized area — not rural
Newton (east of Covington)YES with letterEast metro. Screen ordinance individually. Outer tracts likely rural-qualifying.Outer tracts only
RockdaleYES with letterEast metro. Screen individually.Verify per tract
DouglasYES with letterWest metro. Some hyperscale interest (Meta area). Most inside urbanized area.Most tracts fail
CarrollYES with letterWest metro. Outer tracts west of Carrollton likely rural.Outer tracts only

Tier 3 — Definitively rural Georgia

Rural confirmed

North Georgia mountains

White · Rabun · Union · Fannin · Habersham · Hart · Franklin · Elbert. Definitively rural. TVA-adjacent hydro / Blue Ridge EMC. Fiber weaker — plan build-out.

Rural confirmed

South Georgia agricultural corridor

Bulloch · Emanuel · Jefferson. Rural. Georgia Power + strong solar potential. Savannah PoP proximity. Lowest land basis in the state.

Border expansion — TVA · SW Virginia · Upstate SC

TVA territory

Tennessee River Valley (E TN · N AL · N MS)

Cheapest US industrial rates. Rural QROF-eligible in many tracts. TVA structure supports large-scale industrial development. Fiber via Chattanooga / Huntsville / Muscle Shoals PoPs.

PJM SREC market

Southwest Virginia

Access to PJM compliance-market SREC pricing (vs. GA voluntary-only). Deep rural QROF stack. Appalachian Power territory. Nearest metro: Roanoke / Tri-Cities.

Duke Energy

Rural upstate South Carolina

Charlotte AI-cloud demand overflow. Duke Energy Carolinas. Rural upstate counties (Cherokee, Union, Chester, Laurens) hold QROF-eligible tracts.

Do NOT deploy (jurisdictional bans)

Prohibited zones City of Atlanta: Data-center ban within 2,640 ft of high-capacity transit stops (Ordinance 24-O-1222) and inside the Beltline Overlay. Use-based definition — no size floor.
DeKalb County: Active moratorium on data-center use.
Fayetteville / South Fulton: Restrictive ordinance activity 2025-26.
Palmetto: Municipal restrictions.

The Path B rural QROF strategy exists precisely to avoid these jurisdictions while remaining within Georgia Power delivery capability.

Site selection discipline — the 7-step screen

  1. PPA / power path first · locked PPA rate + assignability language + utility posture on novation. No power path, no deal.
  2. Zoning verification letter · written letter from county zoning official confirming data-center use is permitted, before any option agreement.
  3. Rural QROF tract test · pull tract ID from 2020 Census. Confirm no city / town > 50k population within tract and no urbanized-area contiguity. Verify against 2027 map when certified.
  4. Site control on option, not purchase · option agreement pre-Jan 1, 2027 to preserve OZ deployment discipline. Purchase closes at deal close.
  5. Fiber diligence · minimum 2 carrier options. Latency to Atlanta / Dallas / Charlotte AI-cloud PoPs.
  6. Water + climate · immersion needs modest but nonzero water. Ambient design temp per NOAA design-day data.
  7. Community engagement · show up at county EDC early with jobs + tax base story. This is how you convert "yes with letter" jurisdictions into "best."

Multi-site portfolio economics

Every additional site on the same rails compounds three ways:

Read roadmap in whitepaper →