GGA-RWA-EDGE
Whitepaper · v1.0 · July 2026

GA-RWA-EDGE: Non-custodial rails for tokenized ownership of Georgia edge data centers, PPA-anchored deals, and QROF equity.

This paper describes the operating stack, technical primitives, capital-formation mechanics, tax framework, and repeatable deal execution for a four-entity institutional infrastructure. It is intended for accredited investors, senior lenders, EPC contractors, custodians, and regulators evaluating the scaffolding before any live offering.

Table of contents

  1. Executive summary
  2. Investment thesis
  3. Architecture — the four-entity operating stack
  4. Smart contracts and technical primitives
  5. Compliance framework · ERC-3643 · IdentityRegistry · AML
  6. Capital stack and financing mechanics
  7. Tax framework · QROF · MACRS · Section 179
  8. Waterfall priority and DSCR discipline
  9. Deal execution — the Barak 5 MW case
  10. Multi-location strategy
  11. Builder and custody partners
  12. BD-of-record → own BD → LDX-as-ATS
  13. Risk factors
  14. Roadmap and milestones
  15. Disclosures

1 · Executive summary

GA-RWA-EDGE is institutional infrastructure for issuing, servicing, and distributing tokenized ownership interests in Atlanta and Georgia edge data-center sites, AI compute hosting sites, and PPA-anchored hospitality assets. The anchor candidate is a rural North Georgia 5 MW site (Barak/Brock) represented by the operator to be running at 4.9¢/kWh fixed PPA with ~721 miners currently deployed. All Barak site facts are per operator and subject to Phase 0 diligence verification before use in any subscription document or lender package. Detailed Phase 0 gates are documented in the PPA diligence pack.

The stack separates four operating roles into four distinct legal entities. This separation is not stylistic. It is what allows senior lenders (typically CRE, USDA B&I, or C-PACE) to interface with a clean single-purpose entity that owes them senior debt, while securities regulators observe issuance under Regulation D Rule 506(c) with counsel-opined Rule 144 tacking language, while custodians hold assets in a bank-chartered qualified vault, and while the technology company earns fees without balance-sheet risk or FINRA licensing exposure.

The four entities are Unykorn LLC (technology rails), LD Capital LLC (issuance and Qualified Opportunity Fund administration), FTH Trading (securities distribution and secondary markets), and Asset SPEs (bankruptcy-remote borrowers holding physical assets and revenue contracts). Money never sits with Unykorn or FTH. Assets live only in Site SPEs.

One-line thesis Contracted AI hosting revenue backed by locked PPA power, wrapped in a Qualified Rural Opportunity Fund equity tranche, distributed via ERC-3643 permissioned securities on non-custodial rails with waterfall discipline that treats the utility payment as Priority 1.

2 · Investment thesis

Four factors intersect. Any two of them constitute a real deal. All four together are rare.

  1. Locked-in power at a below-market rate. The Barak site has a fixed-rate PPA at 4.9 cents per kilowatt-hour. Wholesale power in most metro Southeast markets currently runs 6–9 cents. Locked-in below-market power is the largest single input cost advantage in compute infrastructure.
  2. Existing operational site. This is not a greenfield build with a two-year interconnect queue and a three-year construction schedule. It is a running facility with 721 miners currently drawing power, revenue-generating today. Conversion is a retrofit, not a construction project.
  3. OZ 2.0 Qualified Rural Opportunity Fund tier (pending tract designation). If the site's census tract is designated rural under the 2027 OZ 2.0 map, cap-gains investors receive a 30% basis step-up at year 5 (vs. 10% for standard QOF) and a 50% substantial-improvement threshold. On $4M of QROF equity that means roughly $1.2M of federal tax benefit before any project-level appreciation is considered.
  4. Non-custodial rails with public code. The 27-contract smart-contract suite is open-source, audit-track, and compiling under solc 0.8.36 with EVM Cancun. Every distribution, every attestation, and every transfer runs through published contracts. There is no black box operational risk.

3 · Architecture — the four-entity operating stack

THE STACK  ·  Four entities · zero role overlap · Unykorn holds no capital

 ┌─────────────────┐   ┌─────────────────┐   ┌──────────────────┐
 │   UNYKORN LLC   │   │   LD CAPITAL    │   │   FTH TRADING    │
 │  (rails / tech) │   │ (issuance /     │   │ (markets /       │
 │                 │   │  QROF admin /   │   │  distribution /  │
 │  contracts      │   │  structuring)   │   │  BD track /      │
 │  compliance     │   │                 │   │  LDX venue)      │
 │  attestation    │   │  506(c) / Reg S │   │                  │
 │  AI + portals   │   │  servicing      │   │  BD-of-record →  │
 │                 │   │                 │   │  own BD → ATS    │
 └────────┬────────┘   └────────┬────────┘   └────────┬─────────┘
          │                     │                     │
          │ rails / attestation │ issues securities   │ distributes
          ▼                     ▼                     ▼
      ┌─────────────────────────────────────────────────────┐
      │                ASSET SPE(s)                          │
      │  Bankruptcy-remote borrower · one per asset         │
      │  Holds: land · PPA rights · pods · hosting contracts│
      └─────────────────────────────────────────────────────┘

 Money never sits in Unykorn or FTH.  Assets live ONLY in SPEs.
 Securities are issued by SPEs/funds via LD Capital.
 FTH Trading touches SECURITIES MARKETS, never custody.

3.1 Why four entities and not one

Consolidation attracts problems from every side. A single-entity operator that holds assets, issues securities, custody funds, and operates rails needs (a) a broker-dealer registration for any transaction-based securities compensation, (b) qualified-custodian licensing for held customer assets, (c) SPE-clean separation for every senior debt facility, and (d) a compliance calendar spanning FINRA, SEC, state MTL, and any tokenization-specific rules. The regulatory footprint is enormous and the audit fees compound.

Four entities with disciplined role separation solves each problem in its natural place: senior lenders sign against Site SPEs, custody sits at BitGo Bank & Trust N.A. or equivalent OCC-chartered institution, securities distribution runs through FTH Trading (BD-of-record in Stage 1, own BD Stage 2, LDX-as-ATS Stage 3), and Unykorn earns technology fees only — never transaction-based securities compensation.

4 · Smart contracts and technical primitives

The 27-contract Solidity suite is organized into six domains. All contracts compile under solc 0.8.36 with EVM Cancun target using integer minor units throughout. Custom errors, event emission on every state change, and role-based access control (Owner ≠ Agent) are enforced.

DomainContractsPurpose
CoreRoles · ECDSALib · AttestationVerifier · ReserveProofAnchor · DealRegistry · CustodyAdapter · AMLTravelRuleGate · LDTimelock · ReentrancyGuard · FeeCollectorShared primitives: identity, attestation quorum, deal registration, fee routing
ComplianceIdentityRegistry · ModularCompliance · LDSecurityToken (ERC-3643) · Rule144Lockup · CountryRestrict · MaxHolders · ModuleBasePermissioned security token stack. Every transfer runs through the compliance gate.
Capital pathsTrancheToken · DSCRTrigger · CMBSWaterfallStructured-credit path: senior/junior tranches, coverage triggers, deterministic waterfall
VaultsAsyncVault (ERC-7540) · MultiAssetEntry (ERC-7575)Async request/pending/claimable/claimed lifecycle; one Share Token accepting many entry assets
ESGSRECModule · CarbonModule · GasAttestationSerial-anchored REC/SREC ledger, voluntary+compliance carbon ledger, gas emissions attestation
InterfacesICompliance · IERC20ERC-3643-aligned compliance interface, standard token interface

4.1 ReserveProofAnchor — the evidence chain

Every material real-world fact underlying a deal is hashed and anchored on-chain via ReserveProofAnchor. This includes the executed PPA document, EPC scope + FAT/SAT/IST certificates, hosting-contract counterparty and terms, appraisals, zoning verification letters, utility load letters, SREC registry serials, and gas-generation emissions attestations. The anchor produces a permanent, auditable proof that the SPE controls the asset and that the underwriting facts existed at claimed time.

The contract does not constitute legal ownership by itself. It evidences that a specific document existed at a specific time with a specific hash, signed by an m-of-n oracle quorum. Legal collateralization (the SPV structure, security agreement, control agreement, and counsel opinion) lives off-chain and is referenced by legalRef.

4.2 CMBSWaterfall — deterministic distribution

Distributions execute deterministically. Priority 1 is always the utility / PPA payment. Priority 2 is senior debt service. Priority 3 is platform fees (Unykorn + LD Capital). Priority 4 is tax-equity allocations if applicable. Priority 5 is subordinate / QROF equity. Priority 6 is sponsor promote.

Priority 1 is Priority 1 because a missed utility payment triggers PPA termination, which collapses the deal thesis. The waterfall math tests DSCR net of PPA demand charges — not gross of them. This is the single most important underwriting distinction between a compute-hosting deal and a traditional real-estate deal.

5 · Compliance framework

The tokenized security is an ERC-3643 permissioned token. Every transfer runs through IdentityRegistry (which maps wallet to verified identity + accreditation status + country) and AMLTravelRuleGate (which enforces travel-rule data payload for over-threshold transfers). Modular compliance additionally supports Rule144LockupModule (holding-period enforcement per counsel opinion), CountryRestrictModule (jurisdictional gating for Reg S), and MaxHoldersModule (Reg D 506(c) beneficial-holder count cap).

Compliance is a hard gate — value cannot move unless the compliance check passes. An unverified wallet is structurally unable to receive tokens. This is enforcement before movement, not review after.

6 · Capital stack and financing mechanics

The base case for the Barak 5 MW conversion. Total project cost ~$20M after removing solar co-location (solar ITC cutoff missed July 4, 2026).

Layer%AmountSource
Senior debt60%$12.0MData-center CRE · USDA B&I (if rural QROF) · C-PACE
Equipment / GPU debt15%$3.0MVendor programs · GPU-backed lending
QROF preferred equity20%$4.0MCap-gains sellers · rural 30% step-up · 10-yr hold · Reg D 506(c) via FTH
Sponsor + Barak5%$1.0MSponsor + Barak PPA contribution (cash / promote / equity blend)
Total100%$20.0M—

Senior LTV of 60% is conservative for a locked PPA site with existing operational load. As PPA diligence items 1–5 confirm, the senior advance rate could rise to 65–70%, reducing residual equity by roughly $1–2M.

7 · Tax framework

7.1 QROF (Qualified Rural Opportunity Fund) — the primary tax lever

A cap-gains investor with $4M in eligible gains rolls the gains into the QROF within 180 days. The gains are deferred. After a continuous 5-year hold, the investor receives a 30% basis step-up (versus 10% for standard QOF). On $4M of deferred gain, that is $1.2M of basis increase — worth roughly $286k in federal tax savings at the 23.8% LTCG + NIIT rate.

After a 10-year hold, appreciation on the QROF interest itself is generally excluded from tax (basis reset to fair market value on sale, subject to OZ 2.0 30-year FMV election rules). This is separate from the 5-year step-up.

7.2 MACRS + 100% bonus depreciation

The 100% bonus depreciation restored permanently under OBBBA applies to non-solar equipment placed in service after January 19, 2025. This includes IT equipment (5-year), immersion cooling and racks (5-year), UPS and switchgear (5- or 7-year), and land improvements (15-year). No solar ITC basis reduction applies because no solar ITC is being claimed (see 7.4).

On the Barak site, roughly $13M of the $20M project cost qualifies as 5-year MACRS property with 100% bonus. That produces a Year-1 deduction of $13M against ordinary income for the taking partner — most valuable to a partnership-flip tax-equity partner if one is retained, or to the sponsor otherwise.

7.3 Section 179

The 2026 §179 limit is $2.56M with phase-out beginning at $4.09M and fully phased out at $6.65M. On a Barak-scale project this is meaningful for early-stage equipment purchases before bonus depreciation kicks in on other property.

7.4 Solar / wind ITC §48E — cutoff missed

The begin-construction safe harbor for solar and wind ITC under Section 48E lapsed on July 4, 2026. New solar / wind builds no longer qualify. The Barak project accordingly does not model solar ITC into the base capital stack. Storage-only ITC survives through 2033 with begin-construction runway, and 45Q carbon capture credits remain available, but neither is modeled as a live layer in the base case.

8 · Waterfall priority and DSCR discipline

CMBSWaterfall.distribute()  ·  Barak 5 MW / 4.9¢ PPA

Period revenue in:          $750,000  (illustrative monthly hosting rev)
   │
   ▼
Priority 1  Utility / PPA:  $179,000  ← 4.9¢ × 5 MW × 730 hr, monthly
Priority 2  Senior debt:    $152,000  ← $12M @ 8.5%, 15yr amort
Priority 3  Platform fees:  $ 15,000  ← Unykorn SaaS + LD servicing
Priority 4  Equipment debt: $ 30,000  ← if outstanding
Priority 5  Opex reserve:   $ 68,000  ← taxes + insurance + maintenance
Priority 6  QROF equity:    $180,000  ← distributed pro-rata
Priority 7  Sponsor promote:$126,000  ← after hurdle
                             ───────
Total distributed:          $750,000
                             ═══════

DSCR is tested net of PPA demand charges:

DSCR = (Hosting Revenue − Utility Charges − Opex − Taxes) ÷ Annual Debt Service
     = (9,000,000 − 2,146,200 − 800,000 − 150,000) ÷ 1,824,000
     = 5,903,800 ÷ 1,824,000
     = 3.24x   ← comfortable over 1.25x underwrite gate

Gate thresholds:
   PASS underwrite       1.25x
   CASH_TRAP             1.20x
   TURBO_AMORT           1.10x
   COVENANT_BREACH       1.00x

9 · Deal execution — the Barak 5 MW case

9.1 Confirmed facts

9.2 Open diligence — the five Go/No-Go items

Do not sign an equity term sheet before these are resolved:

  1. PPA term length remaining at 4.9¢
  2. Assignability language (free / consent-required / restricted)
  3. Barak entity corporate authority to assign
  4. Utility posture — full novation vs assignment-only
  5. Existing 721 miner contracts — assumable or terminable

9.3 The 12-week sprint (post-diligence)

  1. Weeks 1-2 · Complete Barak's 12-item PPA diligence pack. Zoning + rural qualification screen. Decision: Path B (rural QROF) confirmed or fallback to standard QOF.
  2. Weeks 3-5 · Site SPE formed. PPA assigned or novated into SPE. First ReserveProofAnchor attestation of PPA + key commercial terms. Senior debt process launched with three lenders.
  3. Weeks 6-9 · QROF documents finalized by OZ counsel + CPA. Reg D 506(c) PPM issued via FTH Trading BD-of-record partnership. Investor onboarding through IdentityRegistry + AMLTravelRuleGate.
  4. Weeks 10-12 · Equity + senior debt close into bank escrow. Funds release to SPE only after compliance gates clear. Modular pods ordered. Immersion retrofit begins.
  5. Post-close · Hosting contracts signed with AI-cloud counterparty. CMBSWaterfall distributions begin. Seasoned revenue notes eligible for Centrifuge warehouse leverage after 6-12 months payment history.

10 · Multi-location strategy

The four-entity stack is asset-class-agnostic and location-agnostic. Site SPEs are formed per parcel; the same LD Capital / Unykorn / FTH rails support each without re-engineering. Detailed location analysis lives in the Locations page.

Phase 0 · candidate

Barak · rural North Georgia · 5 MW

Per operator: 4.9¢/kWh fixed PPA, ~721 miners. Path B rural-QROF conversion candidate. Site status pending Phase 0 diligence.

Pipeline

North Georgia rural

White, Rabun, Union, Fannin counties. Definitively rural for QROF 30% step-up.

Pipeline

Metro ring counties

Coweta, Clayton, Jackson, Newton, Douglas, Carroll — outer tracts.

Border

TVA · SW VA · Upstate SC

Cheapest US industrial rates. PJM SREC compliance market access via VA.

11 · Builder and custody partners

The stack integrates with named institutional counterparties in each category. Detailed partner matrix lives in the Partners page. In brief:

12 · BD-of-record → own BD → LDX-as-ATS

FTH Trading follows a disciplined three-stage broker-dealer path. Stage 1 is a BD-of-record partnership: a registered broker-dealer papers third-party securities placement, FTH refers investors and handles all non-securities work. Stage 2 is FTH filing Form NMA to become its own FINRA-registered BD (12-18 months, $250-750k). Stage 3 is FTH's LDX venue filing Form ATS to operate as an Alternative Trading System for secondary trading.

Until Stage 2 closes, FTH takes no transaction-based securities compensation. Its 2026-27 revenue is (a) technology fees under the Unykorn / LD Capital service agreements and (b) the BD-of-record partnership economics. Skipping Stage 1 and taking finder fees on third-party paper is the classic unregistered-BD trap — SEC rescission rights kill cap tables.

13 · Risk factors

An investment in tokenized Site SPE interests involves substantial risk including the possible loss of the entire investment. Key risks include:

14 · Roadmap and milestones

  1. Q3 2026 · Complete this whitepaper, PPM template, and public GitHub Pages site. Retain OZ counsel, securities counsel, and CPA administrator. Engage BitGo custody. Sign BD-of-record partnership. Complete Barak PPA diligence.
  2. Q4 2026 · Barak Site SPE formed. PPA assigned. Senior debt term sheet negotiated. QROF vehicle formed. Reg D 506(c) PPM finalized. Investor pipeline warmed. First dual smart-contract audit engagement.
  3. Jan 1, 2027 · New OZ 2.0 zones effective. Deploy: QROF closes, senior debt closes, Site SPE takes title / PPA assignment, immersion retrofit begins.
  4. Q1-Q2 2027 · First contracted AI hosting revenue. First waterfall distribution. Second smart-contract audit. FTH files Form NMA (own BD).
  5. Q3 2027 → · Seasoned note book (6+ months payment history) begins graduation to Centrifuge V3 institutional pool. Second Site SPE spinning up. Third site under diligence.
  6. Mid 2027 - 2028 · FTH's own BD goes live (Stage 2). LDX venue files Form ATS. Rated securitization conversations begin against 3-5 seasoned sites.

15 · Disclosures

Not an offer · not advice Nothing in this whitepaper is an offer to sell or a solicitation of an offer to buy any security. Any offering of securities will be made only pursuant to definitive offering documents (a Private Placement Memorandum), only to verified accredited investors under Regulation D Rule 506(c) or non-U.S. persons under Regulation S, and only after all pre-mainnet blockers have cleared. This whitepaper does not constitute legal, tax, or investment advice. Consult your own counsel.
Pre-mainnet blockers Dual independent smart-contract security audits · Securities counsel Rule 144 opinion + 506(c) / Reg S offering documents · Off-chain legal SPV package behind every ReserveProofAnchor reserve · BD registration (own) or BD-of-record engagement executed · BitGo Bank & Trust N.A. (or Anchorage) custody engagement live · CPA administrator retained for QOF 90% asset test · Multisig owner deployed (3-of-5 minimum) · Agent keys provisioned in BitGo / Fireblocks with velocity caps.