Executive summary
| Deal | Site SPE I · GA-BARAK-01 |
| Physical | 5 MW operational site · Atlanta market · [address redacted at preview] |
| Current use | 721 bitcoin miners currently operational |
| Power anchor (per operator) | 4.9¢/kWh fixed PPA — Georgia regulated electricity with Territorial Act large-load carve-out. AGL gas-hedge availability subject to delivery-territory confirmation. |
| Annual electricity cost | $2,146,200 |
| Total project cost | $20,000,000 |
| QROF equity offered | $4,000,000 |
| Preferred return | 8% cumulative |
| Hold period | 10 years (aligned with OZ 10-yr tax-free exit) |
Capital stack
| Layer | % | Amount | Source · counterparty |
|---|---|---|---|
| Senior debt | 60% | $12.0M | Peachtree / CIM / USDA B&I (if rural QROF) |
| Equipment / GPU debt | 15% | $3.0M | Vendor programs · GPU-backed lending |
| QROF preferred equity | 20% | $4.0M | Reg D 506(c) via FTH Trading BD-of-record |
| Sponsor + Barak | 5% | $1.0M | Blended cash / promote / equity |
| Total | 100% | $20.0M | — |
Revenue and DSCR projection
Contracted hosting revenue projection (Year 1 stabilized)
Hosting rate assumption: $150/kW/month (conservative; retail AI hosting benchmark)
IT load: 5,000 kW
Gross annual revenue: $9,000,000
Less:
Priority 1 Utility / PPA @ 4.9c $2,146,200
Priority 2 Opex (staff/maint/ins) $ 800,000
Priority 3 Property tax escrow $ 150,000
─────────
NOI available for debt service: $5,903,800
Senior debt service:
$12M at 8.5%, 15-yr amort $1,824,000
DSCR = $5,903,800 / $1,824,000 = 3.24x ← comfortably above 1.25x gate
After debt service, distributions to equity/promote:
Preferred return (8% on $4M QROF): $320,000
Sponsor promote (20% above hurdle): variable
Residual to common equity: variable
Tax benefit summary (illustrative $100k subscription)
| Item | Amount | Timing |
|---|---|---|
| Cap-gain deferral | $100,000 | Immediate (180-day rollover) |
| Basis step-up (rural QROF) | $30,000 | Year 5 |
| Federal tax saved on step-up | $7,140 | Year 5 (at 23.8% LTCG + NIIT) |
| Preferred return @ 8%/yr | $8,000/yr | Years 1-10 (subject to available cash) |
| 10-year OZ exit | Appreciation tax-free | Year 10+ (subject to FMV election) |
Illustrative — not a projection. Actual returns depend on deal execution, hosting revenue, PPA performance, and individual investor tax facts.
The value ladder — what the asset is worth at each step
$5M buys a 10 MW site with a 7-year power position. Worth 2× on day one from Bitcoin alone, scales to 5-9× as you fill the power and shift to AI, and the Opportunity Zone lets you exit that gain tax-free. The RWA raise is the bridge — no selling equity to get there.
| Stage | Configuration | Net income / yr | Enterprise value | On your $5M |
|---|---|---|---|---|
| 1 · Bitcoin today | 6 MW running | $0.8M | $8-10M | ~2× |
| 2 · Bitcoin, filled | 10 MW full power | $1.4M | $14-17M | 2.8-3.4× |
| 3 · Shift to AI / HPC | Same 10 MW · AI tenants | $2.5-3.5M | $25-44M | 5-9× |
| 4 · Opportunity Zone exit | Strong case · 10-yr hold | ~$38M gain | ~$43M EV | $0 tax · ~$9M saved |
Method: enterprise value = annual net operating income ÷ 8-10% digital-infrastructure cap rate. Bitcoin income shown at current hashprice band.
The power position — one PPA, arbitraged between loads
A contracted, below-market power position is the scarce asset. Across this sector the binding constraint is power and interconnect, not capital — so a locked 7-year rate is the moat, not a line item.
The anchor
10 MW · 7-year term · 4.9¢/kWh (per operator, subject to Phase 0 verification). Immune to grid volatility for the full term.
Blend the cost below the floor
| Lever | Mechanism | Effect |
|---|---|---|
| Contracted PPA | 7-year floor at 4.9¢/kWh locked, immune to grid volatility | $0.049 floor |
| Territorial Act carve-out | >900 kW premise may choose supplier at initial connect — not one utility tariff | Lower base |
| Natural gas hedge (AGL) | Layer a gas position where AGL competitive-marketer choice applies · caps price spikes | Caps peaks |
| Storage §48E ITC | Battery storage layer earns 30% federal ITC (valid through 2033) | Tax asset |
Blended cost lands below the 4.9¢ floor — and every cent off the input widens the spread on all 10 MW.
Same power, two ways to monetize
Bitcoin — monetize every MW today
- No tenant needed — point power at hashrate, earn from day one
- Fully interruptible — curtail on price spikes; earn demand-response / grid credits
- Hashprice-dependent — lower $/MW
- Role: never leave an idle MW unmonetized
AI / HPC colocation — capture more per MW
- Much higher $/MW — contracted colocation NOI
- Needs an anchor tenant + firmer power & cooling
- Tenant-gated — the honest constraint
- Role: convert MW from Bitcoin as tenants sign
Risk register — the 8 items that could kill the deal
- PPA not cleanly assignable — diligence Go/No-Go items 1, 6, 12. Utility blocks assignment or restricts consent unreasonably → walk away.
- Rural QROF tract fails 2027 certification — fallback to standard QOF (10% step-up). Deal still works with modestly reduced tax benefit.
- Existing 721 miner contracts non-terminable — buyout cost exceeds $2M provision, requires equity increase.
- Hosting counterparty concentration — single-tenant AI hosting deals concentrate credit risk. Underwriting requires multi-tenant target.
- Cost overrun on immersion retrofit — fixed-price EPC + 10-15% contingency in stack. Sensitivity: every $2M/MW overrun adds ~$8-10M equity.
- GPU depreciation curve — chips are harder collateral than land + power. Structure equipment debt with matching amortization.
- DSCR breach — Priority 1 utility payment sweeps before senior debt. If hosting revenue falls > 65%, DSCR triggers cash trap; > 75% triggers turbo amort.
- Local ordinance change — county EDC engagement + written zoning verification letter before any capital moves.
Deal timeline (post PPA-diligence)
Week 1-2 PPA diligence complete · Path B (rural QROF) decision · site walk Week 3-5 SPE formed · PPA assigned/novated · first ReserveProofAnchor Week 3-5 Senior debt process launched (3 target lenders) Week 6-9 QROF documents finalized · Reg D 506(c) PPM issued Week 6-9 Investor onboarding through Persona · KYC/AML complete Week 10-12 Equity + senior debt close into bank/trust escrow Week 10-12 Escrow releases to SPE · tokens mint · immersion retrofit begins Post-close Hosting contracts signed · CMBSWaterfall distributions begin 6-12 mo Seasoned book eligible for Centrifuge V3 warehouse advance Year 5 QROF 30% basis step-up locks Year 10 OZ tax-free exit window opens
Governance and voting
Preferred token holders are non-voting except for material transactions requiring holder consent:
- Sale of substantially all Site SPE assets
- Dissolution or bankruptcy filing
- Amendment of LLC agreement in a manner adverse to preferred holders
- Modification of PPA rate or term (would materially affect DSCR)
- Change of servicer / QROF administrator
All routine operational decisions (hosting contract signing, capex within budget, refinance decisions) are made by the Sponsor Manager under the delegated authority in the LLC operating agreement.
Reporting cadence
| Report | Cadence | Delivery |
|---|---|---|
| Waterfall distribution statement | Quarterly | On-chain event + email PDF |
| DSCR + hosting revenue update | Quarterly | Portal + on-chain hash |
| QROF 90% asset test | Semiannual | CPA-attested, on-chain-anchored |
| K-1 (pass-through partners) | Annual | Portal PDF |
| Audited financials | Annual | Portal PDF + on-chain hash |
| Ad hoc material events | As needed | Email + on-chain event |
Next steps for prospective investors
- Complete third-party accreditation via Persona or Parallel Markets
- Sign NDA (deal book contains commercially sensitive information)
- Access full deal book (unredacted commercial terms, counterparty identities)
- Attend sponsor + counsel Q&A session
- Review definitive PPM (issued by securities counsel)
- Execute subscription documents + wire funds to bank / trust escrow
- Compliance gates re-check → atomic token mint at closing
Deal Book v1.0 preview · Site SPE I / GA-BARAK-01 · Not a live offering. Full deal book access requires third-party accreditation verification.