GGA-RWA-EDGE
Introductory Offer · Site SPE I · Reg D 506(c)

An institutional real-estate + compute infrastructure deal wrapped in a Qualified Rural Opportunity Fund.

For accredited cap-gains investors seeking (a) 30% basis step-up at year 5, (b) 10-year tax-free growth on OZ appreciation, and (c) contracted AI hosting revenue backed by a 4.9¢/kWh locked PPA. Introductory terms below.

Not a live offering This page describes intended terms of an offering that will only launch after all pre-mainnet blockers clear. No investment is being solicited or accepted at this time. Read the PPM template and whitepaper for context.

The one-page summary

DealSite SPE I · Barak/Brock rural North Georgia candidate site conversion (Phase 0 pending)
Anchor asset (per operator)4.9¢/kWh fixed PPA · ~721 miners represented on site · AGL gas-hedge availability subject to territory confirmation. All site representations subject to Phase 0 diligence.
Total project cost$20,000,000
QROF equity tranche$4,000,000 (20% of project)
Minimum investment$50,000
Preferred return8% cumulative, paid quarterly
Sponsor promote20% of upside above hurdle
Hold period10 years minimum (aligned with OZ 10-yr tax-free exit)
Tax wrapperQualified Rural Opportunity Fund · 30% basis step-up at year 5 · 10-yr tax-free appreciation
CustodianBitGo Bank & Trust N.A. (primary)
Token standardERC-3643 permissioned security token

Why this deal is different

Locked power

4.9¢/kWh fixed PPA

Below-market power under a fixed-rate contract as represented by the operator. Wholesale power in metro Southeast markets currently runs 6–9¢/kWh, versus the represented 4.9¢/kWh at Barak — the largest single cost-input advantage in compute infrastructure if verified. Georgia electricity remains regulated (Territorial Act large-load carve-out); AGL gas hedge availability is site-territory specific.

Operating today

Not a greenfield build

721 miners already drawing power. Site energized, utility letter effectively pre-issued via active load. This is a retrofit + conversion, not a two-year construction project.

Rural QROF

30% basis step-up (target)

If the site's census tract is designated rural under the 2027 OZ 2.0 map (certification Q4 2026), cap-gains investors receive 3× the standard QOF step-up plus 50% substantial-improvement threshold.

Non-custodial rails

27 audit-track contracts

Open-source Solidity suite (solc 0.8.36 · EVM Cancun) enforcing identity + AML + attestation + waterfall priorities. Every distribution reconciles to an independent Python model to the cent.

Illustrative investor economics on $100k subscription

Illustrative only · Not a projection The numbers below are for illustration of tax mechanics and do NOT constitute a return projection. Actual returns depend on deal execution, hosting revenue realization, PPA performance, and individual investor tax facts. Consult your own tax advisor.
YearCash distribution (target 8% pref)Federal tax benefitCumulative
Year 1$8,000$0$8,000
Year 2$8,000$0$16,000
Year 3$8,000$0$24,000
Year 4$8,000$0$32,000
Year 5 (step-up locks)$8,000$7,140$47,140
Year 6-9$32,000$0$79,140
Year 10 exit (OZ 10-yr benefit)$100,000+Appreciation tax-free$179,140+

Year 5 tax benefit = $30,000 basis step-up (30% × $100k deferred gain) × 23.8% (LTCG + NIIT) = $7,140 federal tax saved on deferred gain recognition. Year 10 exit assumes site sold at par + appreciation; OZ 10-yr rule excludes appreciation on the QROF interest itself from federal capital gains tax subject to OZ 2.0 30-year FMV election rules.

Subscription mechanics — 10 steps

  1. Request access to the accredited investor portal via the portal gate.
  2. Verify accreditation through Persona or Parallel Markets (Reg D 506(c) requires third-party verification — not self-certification).
  3. Review definitive PPM, subscription agreement, and investor questionnaire.
  4. Provide cap-gain tax lot information if using the 180-day OZ rollover.
  5. Sign subscription documents and complete KYC / AML.
  6. Wire subscription funds to bank / trust escrow (NOT to any platform wallet).
  7. Wallet mapping: your wallet is registered in IdentityRegistry with your verified accreditation claim.
  8. Closing: at deal close, escrow releases fiat to Site SPE and tokens mint atomically to your wallet.
  9. Custody: hold at BitGo Bank & Trust, Anchorage, Fireblocks, or compliant self-custody.
  10. Ongoing: quarterly distributions, annual K-1, on-chain-verifiable reports.

The four things that must be true for this deal to close

  1. Barak PPA diligence completes cleanly — term, assignability, entity authority, novation posture, and existing miner contracts all resolve as expected.
  2. Site's census tract is designated rural QROF — 2027 OZ 2.0 map certification confirms tract eligibility. Fallback: standard QOF (10% step-up).
  3. Pre-mainnet blockers clear — dual smart-contract audits, securities counsel opinion, BitGo custody live, BD-of-record executed.
  4. Senior debt term sheet is signed — $12M senior at target 60-70% LTV from a named data-center or USDA lender.

If any of these fails, the offering does not launch. Investor funds never leave escrow unless all four hold.

Next steps

To register interest (not yet a commitment) Enter the accredited investor portal, complete third-party accreditation verification, and receive access to the full deal book. Registration of interest does not commit you to invest and does not commit us to accept your investment.