The four buckets that matter
Federal cap-gains & opportunity zone
QROF Qualified Rural Opportunity Fund (30% step-up), OZ 2.0 substantial-improvement 50% threshold, 10-year cap-gains-to-zero. Largest single tax lever for equity investors.
Federal energy & efficiency credits
Storage ITC §48E (30% through 2033), 45Q carbon, MACRS + 100% bonus depreciation, Section 179 property expensing. Section 179D EECBD closes June 30, 2026 for construction start.
Federal rural & SBA loans
USDA B&I Guaranteed Loan (up to $25M, 80-85% guarantee), USDA REDLG (0% RUS pass-through), USDA REAP renewable energy, SBA 504 owner-occupied.
Georgia state & utility
Georgia Data Center Sales & Use Tax Exemption (SB 410 repeal in play), Job Tax Credit, Investment Tax Credit, Georgia Power rate freeze through 2028, AGL competitive-gas territory.
Bucket 1 — Federal Opportunity Zone & cap-gains
| Program | Benefit | Eligibility / threshold | Status |
|---|---|---|---|
| QROF (Qualified Rural Opportunity Fund) — 30% basis step-up | 30% step-up in basis after 5-year hold on cap-gains rolled into a rural QROF (vs. 10% for standard QOF). Triple the near-term shelter. | Investment must be into a QROF classified as rural under OBBBA. Rural test: no city >50k population AND no urbanized-area contiguity. Generally effective for investments beginning 2027 per current IRS guidance — early 2026 investments may still take the 10% step-up. | STABLE (2027+) |
| QROF / OZ 2.0 — 50% substantial-improvement threshold (rural) | Substantial-improvement requirement dropped from 100% to 50% of original adjusted basis for existing property in rural QOZs. Critical for buildings and container-adjacent infrastructure. | Rural OZ tract only. Applies to acquired existing property. | STABLE — effective July 4, 2025 |
| QOF / QROF — 10-year cap-gains-to-zero | Federal capital gains on the QOF/QROF investment appreciation → $0 after 10-year hold. | Any Qualified Opportunity Fund investment held ≥ 10 years, disposed by the fund investor. | STABLE — made permanent under OBBBA |
| OZ cap-gains deferral | Deferral of the original cap-gains liability until 2026 tax year (recognition event) if rolled into a QOF within 180 days. | Standard OZ eligible gain (short-term, long-term, §1231, §1250 recapture components — check with CPA). | STABLE |
Bucket 2 — Federal energy & efficiency credits
| Program | Benefit | Eligibility / threshold | Status |
|---|---|---|---|
| Storage ITC §48E — battery / BESS / geothermal / hydro / nuclear | 30% investment tax credit on standalone energy storage (battery), geothermal, hydro, and nuclear. | Facility placed in service. Prevailing-wage / apprenticeship requirements for full 30%. Bonus adders (10% each) for domestic content and energy communities. | STABLE — through 2033, phaseout begins 2034 |
| Solar / wind ITC §48E | 30% investment tax credit for solar and wind. | Construction must have begun on or before 2026-07-04 to qualify for standard placed-in-service window. Post-2026-07-04 starts must be placed in service by 2027-12-31. New FEOC procurement restrictions apply for 2026 starts. | TIME-SENSITIVE / LARGELY CLOSED |
| §179D EECBD — Energy Efficient Commercial Building Deduction | Up to $5.81 per square foot deduction for energy-efficient lighting, HVAC, and envelope in commercial buildings. | Construction must begin on or before June 30, 2026. Projects broken ground by that date remain eligible even if placed in service later. Must reduce energy use vs. the applicable ASHRAE efficiency standard. | TIME-SENSITIVE — construction start ≤ 2026-06-30 |
| §45Q — Carbon Capture Credit | Per-ton tax credit for CO₂ captured and sequestered or utilized (values vary by disposition path; $85/ton for saline storage under IRA). | Facility captures CO₂; storage or utilization documented per §45Q rules. Direct-pay / transferability available. | STABLE |
| MACRS + 100% Bonus Depreciation | 100% bonus depreciation on qualifying property in year one. Made permanent for property placed in service after 2025-01-19 under OBBBA. Restores year-one write-off previously scheduled to phase down. | MACRS 5-year for compute / GPU / servers. 5-year or 7-year for cooling and racks depending on classification. Vehicles & certain fixtures shorter class lives. | STABLE — permanent |
| §179 Property Expensing | Immediate expensing of qualifying property in year one. | 2026 cap: $2.56M; phase-out threshold $4.09M. Real property improvements (roofs, HVAC, fire, security) qualify at the same cap. | STABLE |
Bucket 3 — Federal rural & SBA
| Program | Benefit | Eligibility / threshold | Status |
|---|---|---|---|
| USDA Business & Industry (B&I) Guaranteed Loan | Up to $25M per project. Federal guarantee 80% (loans ≥$5M) or 85% (loans <$5M) against principal loss. | Rural area (population <50k, non-urbanized). Approved lender originates; USDA guarantees. Broad-use — real estate, working capital, equipment, refinance. | STABLE |
| USDA REDLG (Rural Economic Development Loan & Grant) | 0% interest RUS pass-through loans up to $2M; grants up to $300k for project development. | Sub-lender is a USDA rural utilities service borrower (electric or telecom co-op). Rural project. Subordinate layering under senior debt. | STABLE |
| USDA REAP (Rural Energy for America Program) | Grants + guaranteed loans for renewable energy systems and energy-efficiency improvements in rural areas. | Small business or agricultural producer in rural area. Renewable energy, energy efficiency, storage. | STABLE (verify current NOFA) |
| SBA 504 | Subordinate CDC-funded fixed-rate debt up to $5.5M at rates typically 100-200 bps below senior CMBS. Standard stack 50% senior / 40% SBA 504 / 10% sponsor. | Owner-occupied (≥ 51% owner-occupancy). Fits M Helen boutique / independent-flag hospitality; less relevant to compute SPEs. | STABLE |
| SBA 7(a) | Guaranteed working-capital / general business loans up to $5M with 75-85% federal guarantee. | Small business per SBA size standards. Broad-use. | STABLE |
Bucket 4 — Georgia state incentives
| Program | Benefit | Eligibility / threshold | Status |
|---|---|---|---|
| Georgia Data Center Sales & Use Tax Exemption (HB 696, extended by HB 1291) | Full sales-and-use tax exemption on high-tech data center equipment purchases (servers, compute, cooling, networking). | Minimum aggregate investment and job-creation thresholds based on county population. County population <50k: lower threshold; larger counties: higher thresholds. Certification through Georgia Department of Revenue. | POLICY RISK — Currently valid through 2033 per HB 1291 extension. However SB 410 (2026) passed the Georgia Senate to repeal the exemption; House consideration ongoing. Model both retention and repeal scenarios. |
| Georgia Job Tax Credit (JTC) | Per-job tax credit varies by county tier. Tier 1 counties (least developed) up to $4,000/job/year for 5 years. Tier 4 counties up to $1,250/job/year. | Minimum job creation depending on tier (2 jobs Tier 1, 5-25 jobs Tier 2-4). Rural counties heavily favored. | STABLE |
| Georgia Investment Tax Credit | 1-8% credit on qualified capital investment in eligible business enterprises. | Eligible business classes (manufacturing, telecom, warehousing, R&D). Tier-dependent rate. | STABLE |
| Georgia Rural Zone Tax Credit | $2,000 job credit + $4,000 investment credit (per year, up to 5 years) for revitalization of qualified rural zones. | Designated Rural Zones (state-designated downtowns/redevelopment areas). Investment or job creation within zone. | STABLE |
| OneGeorgia Authority — Equity Fund, EDGE Fund, Regional Economic Business Assistance (REBA) | Grants and low-interest financing for infrastructure and workforce in rural Georgia. | Rural county application through OneGeorgia Authority. Partnership with Georgia Department of Community Affairs. | STABLE (application-driven) |
| Georgia Quality Jobs Tax Credit | $2,500 to $5,000 per job for 5 years for creating 50+ new "quality jobs" above county wage floor. | Wage floor 110% of county average. Various eligible industries. | STABLE |
| Georgia Tourism Development Act (M Helen relevant) | Sales-tax rebate to help finance tourism attraction development. | Approved tourism-attraction project. Application through Georgia Department of Community Affairs. | STABLE (application-driven) |
Utility & power — Georgia specifics
| Program / Structure | Benefit | Eligibility / threshold | Status |
|---|---|---|---|
| Georgia Power Base-Rate Freeze through 2028 | Base rates for Georgia Power customers frozen through 2028 per Georgia PSC order (July 31, 2025). | Applies to Georgia Power customers. Fuel-cost adjustments still flow to customers separately. Rate case expected 2028. | STABLE through 2028 |
| Territorial Act Large-Load Carve-out (>900 kW) | New premises with initial connected load above 900 kW may choose their electricity supplier at initial connection. | New premise (not a legacy connection reassigned). Certified retail supplier available. No PSC restriction on premise class. Site-specific PSC / supplier confirmation required. | STABLE (site-specific) |
| AGL (Atlanta Gas Light) territory — Competitive Gas Marketer Choice | Customers in AGL territory buy the gas molecule from competing certified marketers on the open market; delivery through the regulated AGL pipe. PSC publishes a marketer pricing comparison. | Site must be in AGL delivery territory. Enables gas-hedging structures alongside a battery-storage arbitrage. | STABLE (site-specific) |
| Data-Center Cost-Shift Protection Rule (Georgia PSC, 2026) | PSC rules mandate that new data-center customers do not shift infrastructure costs onto residential and other-class ratepayers. | Applies to new large-load customer interconnection at Georgia Power. Impacts interconnect cost recovery. | ACTIVE |
Federal contract & procurement rails (adjacent, useful)
| Program | Benefit | Eligibility / threshold | Status |
|---|---|---|---|
| SAM.gov Registration + UEI / CAGE | Access to federal contracts, sub-contracts, and federal-grant eligibility. | Free registration at SAM.gov. Verified entity + assigned Unique Entity Identifier and CAGE code. | STABLE |
| FedRAMP / DoD IL4-IL6 hosting (compute relevance) | Sales channel for compute infrastructure. Federal customers require FedRAMP-authorized hosting; DoD workloads require IL4/5/6. | Requires FedRAMP-authorized cloud infrastructure and formal ATO (Authority To Operate). | STABLE (multi-year accreditation) |
Application timeline (12-month calendar)
Practical sequencing for a Site SPE that stacks these programs:
Verify site qualification
Confirm QOZ rural test, county tier for Georgia JTC, Rural Zone designation status, AGL delivery territory (if compute), Territorial Act carve-out (if compute).
Structure & entities
Site SPE formed, QROF certification filed, Georgia DOR data-center exemption pre-check (if applicable — track SB 410 status), SAM.gov entity registered.
Federal loan applications
USDA B&I via approved lender (Live Oak / United Community), USDA REDLG through RUS co-op, SBA 504 (if owner-occupied hospitality).
State program applications
OneGeorgia Equity Fund / REBA, Georgia Tourism Development Act (M Helen), Georgia JTC / ITC pre-clearance letters.
Utility & energy
Georgia Power carve-out confirmation (large-load), AGL competitive marketer engagement (gas hedge), storage ITC §48E designer selection.
Post-closing execution
MACRS + bonus depreciation elections, §179 property expensing, §45Q pathway if carbon-capture, prevailing-wage compliance documentation for §48E.
Deadlines to watch (as of 2026 H2)
| Deadline | Program | Action |
|---|---|---|
| 2026-06-30 (past) | §179D EECBD construction start | Only projects broken ground by this date remain eligible. Confirm dated attestation for any active claim. |
| 2026-07-04 (past) | Solar / wind §48E ITC begin-construction safe harbor | Post-cutoff projects must be placed in service by 2027-12-31 + FEOC procurement compliance. |
| 2027-01-01 (upcoming) | QROF 30% basis step-up window opens | Time the largest cap-gains-rollover LPs to close after Jan 1, 2027 for the maximum step-up. |
| 2028 rate case | Georgia Power base-rate reset | Base rate freeze ends. Model both status-quo and rate-case scenarios for post-2028 economics. |
| Live | Georgia Data Center Sales & Use Tax Exemption (SB 410 repeal) | Track SB 410 progress through Georgia House. Model retention and repeal scenarios. |
| 2033 | Storage §48E ITC full-rate window | Phaseout begins 2034. Compute-adjacent BESS should be placed in service before then for full 30%. |
Related
Funding sources
The private-sector counterparties that stack on top of these government programs.
Site locations
Georgia deal geography — Barak / Metro Atlanta / Helen / North Georgia corridor.
Reach LD Capital
Program eligibility discussions, originator intake, accredited investor onboarding.