50 MW AC / 59.69 MWp DC Bifacial PV + 25 MW / 100 MWh LFP BESS — Baní, Dominican Republic
Deterministic Financial Models · SPV Architecture · $35M Acquisition Framework · Shovel-Ready
| File | Description | Type |
|---|---|---|
| README.md | Master institutional README — complete table of contents, Mermaid architecture diagrams, scenario analysis tables, named entities, regulatory stack, $35M acquisition section, shovel-ready permit inventory | MD |
| PROJECT-SUMMARY.md | Executive summary — 50 MW AC / 59.69 MWp DC bifacial PV + 25 MW / 100 MWh 4hr LFP BESS, Baní, Peravia Province, DR. Revenue: $11.6M Year 1, $397M cumulative 25-year, NPV $81.7M @ 8% WACC | MD |
| CAPITAL-STACK.md | Capital stack architecture — baseline 60/40 D/E, 126-combination sensitivity matrix, WACC 7.5–8.5%, 14+ capital pathways mapped, DFI concessionality impact analysis | MD |
| RISK-MEMO.md | Risk matrix — 10 categories: construction, political, FX (DOP/USD), offtake, environmental, grid interconnection, technology, title, regulatory, liquidity. Mitigation strategies per category. Insurance stack | MD |
| TOKENIZATION-STRUCTURE.md | Tokenization — $15M raise target, $100/token, 8% preferred return, 20% participation, Reg D 506(c), ERC-20 with lockup, secondary OTC market structure, SPV ring-fence | MD |
| File | Description | Type |
|---|---|---|
| config/project.js | Master SSOT: project (50MW/59.69MWp/440.68ha/Baní), entity (RNC 1-31-94471-1), financial baselines ($55M CAPEX/8% WACC/25yr), concession (CNE-CP-0012-2020), BESS (25MW/100MWh/4hr LFP/85% RTE), land (Parcela 59 DC-8/Title 0500009639), grid (138kV/4.5km), acquisition ($35M/4-tranche milestone), carbon (38,400 tCO2e/yr/Verra VCS), tax incentives (100% import duty exemption/ITBIS exempt/10yr income tax holiday per Ley 57-07) | JS SSOT |
| package.json | Node.js project manifest — dependencies (express, chart.js), scripts for dashboard, test, and export commands | JSON |
| Parameter | Value | Source |
|---|---|---|
| Nominal Capacity (AC) | 50 MW | CNE-CP-0012-2020 |
| Peak Capacity (DC) | 59.69 MWp | LARED Executive Summary |
| DC/AC Ratio | 1.194 | Calculated |
| Concession Area | 161 ha (within 440.68 ha parcel) | LARED Executive Summary |
| Total Land Area | 440.68 ha / 4,406,824 m² | Land Appraisal May 2025 |
| Cadastral Area (Survey) | 4,364,305.59 m² (318+ vertices) | Cadastral Survey 2020 |
| Grid Interconnection | 138kV · Barra Peravia Solar I&II / Calabaza I | LARED / ETED |
| Transmission Line | 4.5 km double-circuit | LARED Executive Summary |
| BESS (Minimum Required) | >20 MW (mandatory per regulations) | LARED Executive Summary |
| BESS (Base Case) | 25 MW / 100 MWh / 4hr LFP | Financial Model |
| Environmental License | 0379-20 | LARED Executive Summary |
| Total Investment | ~US$55M | LARED Executive Summary |
| Component | Specification | Quantity / Detail |
|---|---|---|
| Nominal Capacity | 140.4 MW AC | 161.5 MWp DC · DC/AC ratio 1.15 |
| PV Modules | Trina Solar TSM-715NEG21C.20 | 715W bifacial · 225,848 modules |
| Inverters | Sungrow SG1100UD | 111 units · 1,100 kVA each |
| Combiner Transformers | 14 CTs | 10.1 MVA each |
| String Configuration | 28 modules/string | 10° fixed tilt · 9.4m pitch |
| BESS | 324 MWh / 81 MW / 4hr | LFP battery energy storage |
| Project Area | 262.35 ha | Perimeter fence: 4.68 km |
| Component | Specification | Quantity / Detail |
|---|---|---|
| Nominal Capacity | 99.9 MW AC | 114.9 MWp DC · DC/AC ratio 1.15 |
| PV Modules | Risen Energy RSM132-8-655BMDG | 655W bifacial · 175,440 modules |
| Inverters | Sungrow SG1100UD | 79 units · 1,100 kVA each |
| Combiner Transformers | 10 CTs | — |
| String Configuration | 30 modules/string | 10° fixed tilt · 9.1m pitch |
| BESS | 119.9 MWh / 30 MW / 4hr | LFP battery energy storage |
| Zone | Area (m²) | Unit Price (RD$/m²) | Value (RD$) |
|---|---|---|---|
| Highway Frontage | 267,675 | RD$5,626.32 | RD$1,506,025,206 |
| Mid-Zone (Agricultural) | 2,019,629 | RD$651.75 | RD$1,316,293,201 |
| Remote Zone | 2,019,629 | RD$73.18 | RD$147,796,450 |
| TOTAL | 4,306,933 m² | — | RD$2,970,000,000 |
| Entity / Document | Detail | Source |
|---|---|---|
| Project SPV | Sunfarming Dom Rep Invest, S.R.L. | OpenCorporates #549489 |
| RNC (Tax ID) | 1-31-94471-1 | Corporate Registration |
| Mercantil Number | 158067-SD | Corporate Registration |
| Incorporated | May 17, 2019 (expires May 17, 2029) | OpenCorporates |
| Parent Company | Alensys Alternative Energiesysteme AG | OpenCorporates (titular) |
| Manager (Gestor) | Leandro Corral | OpenCorporates |
| DE Address | Zum Wasserwerk 12, Germany | OpenCorporates |
| DR Address | Calle Paseo del Conde 360, Santo Domingo | OpenCorporates |
| No-Overlap Certifier | Juan Ramón Castellanos Taveras (CODIA 2667) | B1 Certification |
| Survey Engineer | Moisés García García (CODIA 16788) | C1 Cadastral Survey |
| CNE Director (Signed) | Lic. Angel S. Cano S. | CNE-CP-0012-2020 |
| Engineering Designer | Jairo Peña | 140MW & 100MW Layouts |
| File | Description | Type |
|---|---|---|
| models/25-year-cashflow.js | Master 25-year cashflow model — DSCR per period, debt service, CFADS, distributions, reinvestment, terminal value. Inputs from config; outputs auditable year-by-year arrays | JS MODEL |
| models/bess-revenue-engine.js | BESS revenue engine — 25 MW / 100 MWh / 4hr LFP, degradation 0.25%/yr, arbitrage + capacity + ancillary services, RTE 85%, availability 97% | JS MODEL |
| models/carbon-credit-engine.js | Carbon credit engine — 38,400 tCO2e/yr baseline, 0.768 tCO2e/MWh grid factor, $15/tCO2e floor with 3% escalation, Verra VCS registration, forward sale model | JS MODEL |
| models/capital-stack-sensitivity.js | Capital stack sensitivity — 126-combination matrix: D/E ratio (50–80%), cost of debt (5–8%), cost of equity (12–18%), WACC optimization, optimal structure identification | JS MODEL |
| models/land-monetization.js | Land monetization — 440.68 ha agrivoltaic revenue, land lease vs. ownership NPV, dual-use solar + agriculture model, grazing/crops under panel arrays | JS MODEL |
| models/token-waterfall.js | Token waterfall — $15M raise, 150,000 tokens @ $100, preferred return 8%, participation 20%, promote split, quarterly distributions, lockup mechanics | JS MODEL |
| models/acquisition-impact.js | Acquisition impact model — $35M purchase price integration into project economics, basis adjustment ($90M total), IRR sensitivity pre/post acquisition, earn-out triggers, combined DSCR analysis | JS MODEL ACQ |
node models/25-year-cashflow.js to verify.
Three scenarios: Conservative (0.85×), Base (1.0×), Aggressive (1.15×).
| Metric | Conservative (0.85×) | Base Case (1.0×) | Aggressive (1.15×) |
|---|---|---|---|
| Levered IRR | 36.8% | 43.3% | 49.8% |
| Unlevered IRR | 18.2% | 21.5% | 24.8% |
| NPV @ 8% WACC | $69.4M | $81.7M | $94.0M |
| NPV @ 10% WACC | $52.7M | $62.0M | $71.3M |
| Equity Multiple | 5.7× | 6.7× | 7.7× |
| Min DSCR | 3.32× | 3.90× | 4.49× |
| Payback Period | ~4 yrs | ~3 yrs | ~2.5 yrs |
| 25-Yr Revenue | $337M | $397M | $457M |
| D/E Ratio | Interest Rate | Levered IRR | DSCR (Min) | WACC |
|---|---|---|---|---|
| 50% / 50% | 5.5% | 38.1% | 4.50× | 8.5% |
| 55% / 45% | 6.0% | 40.7% | 4.12× | 8.1% |
| 60% / 40% | 6.5% | 43.3% | 3.90× | 7.8% |
| 65% / 35% | 7.0% | 46.0% | 3.45× | 7.5% |
| 70% / 30% | 6.0% | 49.1% | 3.20× | 6.8% |
| 75% / 25% | 7.5% | 52.3% | 2.65× | 7.1% |
| 80% / 20% | 5.5% | 55.8% | 2.38× | 5.9% |
| File | Description | Type |
|---|---|---|
| docs/legal/acquisition-35M/asset-purchase-framework.md | Asset purchase framework — $35M total, 4-tranche milestone payments, 5 asset categories (land/concession/permits/SPV equity/development rights), R&W matrix, conditions precedent, risk allocation table, Ley 479-08 compliance | MD LEGAL |
| docs/legal/acquisition-35M/share-purchase-agreement.md | Share purchase agreement — 100% cuotas sociales transfer under Ley 479-08, transfer mechanics, conditions precedent, representation survival schedule, indemnification caps | MD LEGAL |
| docs/legal/acquisition-35M/promesa-de-venta.md | Promesa de venta — $5M deposit, 90-day term + 30-day extension, escrow mechanics, suspensive conditions, 14-term legal glossary, DR civil code compliance | MD LEGAL |
| docs/legal/acquisition-35M/earn-out-addendum.md | Earn-out addendum — value decomposition, performance adjustments (+$1.5M upside / −$7M downside), DR tax treatment (3% transfer / 27% capital gains), milestone verification protocol | MD LEGAL |
| docs/legal/acquisition-35M/closing-checklist.md | Closing checklist — 100+ items across 5 phases: pre-signing, signing $5M, FC $10M, NTP $10M, COD $10M, post-COD escrow release. Owner/deadline matrices | MD LEGAL |
| File | Description | Type |
|---|---|---|
| capital/capital-matrix.js | Master capital matrix — 9-structure comparison engine: WACC per structure, risk score, blended-rate optimization, optimal structure selector, feasibility flags | JS MATRIX |
| capital/outreach-tracker.json | Investor/lender outreach CRM — engagement status tracking, pipeline stage, contact history, follow-up scheduling | JSON |
| GREEN BOND — ICMA Aligned (7 files) | ||
| capital/green-bond/icma-alignment.md | ICMA Green Bond Principles alignment — 4 core components, external review requirements, reporting obligations | MD |
| capital/green-bond/eligible-use-of-proceeds.md | Eligible use of proceeds — solar PV, BESS, grid interconnection, land preparation, environmental monitoring | MD |
| capital/green-bond/ICMA-GBP-Checklist.md | ICMA GBP checklist — point-by-point compliance verification, governance framework, management of proceeds | MD |
| capital/green-bond/SPO-Terms-and-Providers.md | Second Party Opinion — provider evaluation (Sustainalytics, Vigeo Eiris, ISS ESG), scope, timeline, fees | MD |
| capital/green-bond/TVRD-Use-of-Proceeds-Mapping.md | TVRD (Taxonomía Verde RD) use-of-proceeds mapping — Dominican green taxonomy alignment, eligible activity classification | MD |
| capital/green-bond/Green-Bond-Term-Sheet.template.md | Green Bond term sheet template — issuer, size, tenor, coupon, covenants, use of proceeds, security, listing venue | MD |
| capital/green-bond/term-sheet.md | Green Bond commercial term sheet — pricing, structure, mechanics, conditions precedent, closing | MD |
| FIDEICOMISO — SIMV Public Trust (3 files) | ||
| capital/fideicomiso/Fideicomiso-Oferta-Publica-Overview.md | Fideicomiso overview — SIMV-regulated public trust, cashflow assignment structure, ring-fence design | MD |
| capital/fideicomiso/Cashflow-Assignment-and-Ringfence.md | Cashflow assignment & ring-fence — PPA revenue waterfall, collection account, distribution mechanics | MD |
| capital/fideicomiso/Fideicomiso-Term-Sheet.template.md | Fideicomiso term sheet — trustee, beneficiaries, assets in trust, distribution schedule, compliance | MD |
| DFI / MULTILATERAL / BLENDED FINANCE (3 files) | ||
| capital/dfi-blended/IFC-IDB-DFC-GCF-Blended-Stack.md | DFI blended stack — IFC/IDB Invest/DFC/GCF analysis, A/B loan structures, concessionality impact, tenor, pricing | MD |
| capital/multilateral/engagement-map.md | Multilateral engagement map — DFI pipeline stages, contact matrices, application timelines, co-lending structures | MD |
| capital/multilateral/blended-stack-model.js | Blended stack financial model — concessionality impact quantification, WACC reduction analysis, IFC catalyst fund mechanics | JS MODEL |
| CARBON FORWARD (3 files) | ||
| capital/carbon-forward/offtake-model.js | Carbon offtake model — 38,400 tCO2e/yr, forward contract pricing, delivery schedules, buyer credit analysis | JS MODEL |
| capital/carbon-forward/verra-registration-roadmap.md | Verra VCS registration roadmap — PDD development, validation, verification, issuance timeline | MD |
| capital/carbon-forward/Forward-Offtake-Termsheet.template.md | Forward offtake term sheet — price floor, volume commitment, delivery schedule, verification protocol, penalties | MD |
| OTHER CAPITAL PATHWAYS (10 files) | ||
| capital/bess-finance/storage-spv-model.js | BESS storage SPV model — 25MW/100MWh carve-out, lease vs. own analysis, degradation curves, replacement reserve | JS MODEL |
| capital/bess-finance/README.md | BESS finance overview — storage-specific financing strategy, technology risk allocation | MD |
| capital/political-risk/pri-structure.md | Political risk insurance — MIGA/OPIC/PDG structure analysis, spread reduction 50–150bps, coverage scope | MD |
| capital/sustainability-linked-loan/kpi-framework.md | SLL KPI framework — sustainability performance targets, verification, margin ratchet triggers | MD |
| capital/sustainability-linked-loan/Margin-Ratchet-Model.md | Margin ratchet model — step-down/step-up mechanics, E&S performance targets, cost of debt impact | MD |
| capital/ppp/PPP-Law-47-20-Pathway.md | PPP pathway — Ley 47-20, DGAPP process, risk allocation, VfM analysis, public contribution assessment | MD |
| capital/export-credit/ECA-Vendor-Finance-Playbook.md | ECA vendor finance — export credit agency playbook, covered buyer/comprehensive guarantees, OECD terms | MD |
| capital/hybrid-token-bond/digital-bond-structure.md | Hybrid token-bond — digital security structure, blockchain registry, dual compliance (securities + crypto), settlement | MD |
| capital/impact-agriculture/ag-finance.md | Impact agriculture finance — agrivoltaic dual-use, blended impact investment, food security + energy nexus | MD |
| capital/vendor-finance/vendor-terms.md | Vendor finance terms — EPC deferred payment, equipment financing, module supplier credit | MD |
| SOVEREIGN PARTNER & YIELDCO EXIT (4 files) | ||
| capital/sovereign-partner/strategic-stake-model.js | Strategic stake model — sovereign minority stake impact simulation, valuation implications, governance effects | JS MODEL |
| capital/sovereign-partner/README.md | Sovereign partner strategy — state energy company participation pathway, alignment with national energy policy | MD |
| capital/yieldco-exit/yield-model.js | YieldCo exit model — Year 7 drop-down valuation, exit multiple sensitivity, IRR at various cap rates, buyer universe | JS MODEL |
| capital/yieldco-exit/README.md | YieldCo exit strategy — stabilized asset disposition, secondary market liquidity, buyer profiles | MD |
Total: $90M · Blended WACC: ~5.8% · DSCR: 3.90x · Payback: ~3 years
| File | Description | Type |
|---|---|---|
| governance/covenants.js | Covenant monitor — 9 covenants (DSCR/LLCR/D-E/Interest Coverage/Reserve Adequacy + Acq Leverage/Price Cap/Earn-Out/Integration Timeline), state-machine escalation, waterfall redirection triggers | JS |
| governance/enforcement.js | Enforcement engine — distribution suspension, cash sweep activation, step-in rights triggers, secured creditor notifications, cure period tracking | JS |
| governance/dispute_board.js | Dispute resolution board — 4-level escalation (negotiation → mediation → DAB → ICC arbitration), timeline enforcement, decision registry | JS |
| governance/governance-adapter.js | Governance adapter — optional on-chain DAO overlay, audit trail generation, deterministic state transitions, vote recording | JS |
| File | Description | Type |
|---|---|---|
| docs/regulatory/README.md | Regulatory index — overview of all Dominican Republic regulatory requirements, agency map (CNE/SIE/ETED/MEM) | MD |
| docs/regulatory/CNE-Concession-Record.md | CNE concession record — CNE-CP-0012-2020, Res. 0379-20, definitive concession details, renewal timeline, compliance milestones | MD |
| docs/regulatory/Ley-57-07-Incentives-Applicability-Memo.md | Ley 57-07 incentives — 100% import duty exemption on panels/inverters/BESS, ITBIS exemption, 10-year income tax holiday, carbon credit eligibility, Decreto 202-08 implementing regulations | MD |
| docs/regulatory/SIE-Resolution-Index.md | SIE resolution index — interconnection standards, tariff methodology, net metering rules, quality of service codes | MD |
| docs/regulatory/Taxonomia-Verde-RD-Alignment.md | Taxonomía Verde RD alignment — Dominican green taxonomy, eligible activities, reporting requirements, verification | MD |
| docs/regulatory/BESS-Compliance-Memo.md | BESS compliance — battery storage regulatory framework, safety standards, fire code, environmental requirements, islanding protocol | MD |
| Law / Decree | Title | Year | Impact on SunFarm Project |
|---|---|---|---|
| Ley 125-01 | Ley General de Electricidad General Electricity Law |
2001 | Establishes the entire Dominican electricity market structure. Creates CNE (Comisión Nacional de Energía), SIE (Superintendencia de Electricidad), and OC (coordination body). Defines generation concession framework under which Sunfarm's CNE-CP-0012-2020 was issued. Governs grid access, transmission rights, and PPA framework. |
| Ley 57-07 | Ley de Incentivo al Desarrollo de Fuentes Renovables de Energía Renewable Energy Incentive Law |
2007 | CRITICAL — Primary incentive law. Provides: 100% import duty exemption on solar panels, inverters, BESS, transformers; ITBIS (VAT) exemption on all RE equipment; 10-year income tax holiday (100% tax credit on RE investment); carbon credit eligibility; net metering rights; priority grid dispatch. Saves SunFarm ~$8M–$12M in tax burden over project life. |
| Ley 186-07 | Ley sobre el Mercado Hipotecario y el Fideicomiso Mortgage Market & Trust Law |
2007 | Enables Fideicomiso (trust) structures for project finance. SunFarm can use a Fideicomiso de Oferta Pública registered with SIMV to securitize PPA cashflows. Allows ring-fencing of revenue, assignment of receivables, and creation of tradeable trust certificates (certificados de participación). |
| Decreto 202-08 | Reglamento de Aplicación de la Ley 57-07 Implementing Regulations for Ley 57-07 |
2008 | Detailed implementing regulations for Ley 57-07 renewable incentives. Specifies: application procedures for tax exemptions, CNE concession requirements, grid interconnection standards, environmental compliance linkage, reporting requirements for maintaining incentive eligibility. Critical for SunFarm's ongoing compliance. |
| Decreto 717-08 | Incentivos y Beneficios para la Generación Eléctrica Basada en Fuentes Renovables Additional RE Generation Incentives |
2008 | Supplements Ley 57-07 with additional operational incentives. Establishes preferential tariff treatment, streamlined interconnection procedures, and priority dispatch protocols for renewable generators. Provides additional administrative clarity on incentive claim procedures. |
| Decreto 517-25 | Decreto del Gobierno 517-25 Government Decree 517-25 |
2025 | NEWEST — 2025 government decree. Establishes updated project development framework supporting renewable energy deployment. Strengthens institutional commitment to clean energy targets and provides additional regulatory clarity for large-scale solar projects like SunFarm. NEW 2025 |
| Ley 479-08 | Ley General de Sociedades Comerciales y Empresas Individuales de Responsabilidad Limitada Companies & Limited Liability Law |
2008 | Governs the corporate structure of Sunfarming Dom Rep Invest, S.R.L. (RNC 1-31-94471-1). Defines SRL requirements, capital structure rules, director duties, shareholder rights. Critical for SPV architecture (HoldCo → LandCo/EnergySPV/TokenSPV) and acquisition structuring. |
| Ley 47-20 | Ley de Alianzas Público-Privadas Public-Private Partnership Law |
2020 | Enables PPP structures for energy infrastructure. Creates DGAPP as regulating authority. SunFarm can access PPP pathway for government co-investment, viability gap funding, or strategic partnership with state entities (EGEHID). Provides BOT/BOOT framework for long-term concession projects. |
Total estimated incentive value: $20M–$50M over project life · Based on Ley 57-07, Decreto 202-08, Decreto 717-08
| File | Description | Type |
|---|---|---|
| spv/holdco/README.md | HoldCo — Delaware LLC operating agreement, GP/LP structure, tax flow-through, management committee, reserved actions | MD |
| spv/landco/README.md | LandCo — land holding entity, title insurance, mortgage lien priority, agrivoltaic lease structure, easements | MD |
| spv/energy-spv/README.md | EnergySPV — project company, PPA counterparty, concession holder, EPC contract party, O&M, insurance, lender security package | MD |
| spv/token-spv/README.md | TokenSPV — tokenization entity, investment agreement, distribution mechanics, transfer restrictions, compliance | MD |
| File | Description | Type |
|---|---|---|
| SERVER & COMPONENTS | ||
| dashboard/server.js | Express server — route mounting, middleware, static assets, error handling, port 3000, health check endpoint | JS |
| dashboard/components/layout.js | HTML layout template — head, navigation, footer, meta tags, responsive viewport, CSS linkage | JS |
| dashboard/components/nav.js | Navigation component — route links, active state highlighting, mobile hamburger menu, section anchors | JS |
| dashboard/components/charts.js | Chart.js configuration — bar/line/doughnut charts, color palettes, axis formatting, tooltip customization, responsive | JS |
| dashboard/public/style.css | Dashboard CSS — responsive grid, dark theme, chart containers, KPI cards, status badges, mobile first | CSS |
| API ROUTES — 7 ENDPOINTS | ||
| dashboard/routes/executive.js | /executive — project KPIs, entity info, concession status, permit summary, key financial metrics | JS |
| dashboard/routes/cashflow.js | /cashflow — 25-year cashflow projections, DSCR chart data, cumulative revenue, debt service schedule | JS |
| dashboard/routes/bess.js | /bess — storage operations: arbitrage revenue, capacity payments, degradation curves, cycling analysis | JS |
| dashboard/routes/capital.js | /capital — capital stack visualization, D/E sensitivity matrix, WACC analysis, cost of capital breakdown | JS |
| dashboard/routes/carbon.js | /carbon — credit generation projections, Verra pipeline status, forward contract analytics, pricing trends | JS |
| dashboard/routes/land.js | /land — 440.68ha parcel metrics, agrivoltaic revenue, land lease NPV, dual-use analytics | JS |
| dashboard/routes/token.js | /token — tokenization analytics, waterfall distributions, holder tracking, lockup countdown, yield metrics | JS |
| File | Description | Type |
|---|---|---|
| data-room/diligence-checklist.md | Diligence checklist — comprehensive due diligence items across all project dimensions, responsibility matrix | MD |
| data-room/diligence-checklist-expanded.md | Expanded checklist — granular diligence items: permits, title searches, environmental studies, financial audits, engineering reports, insurance policies | MD |
| data-room/document-index.json | Document index — master JSON registry of all project documents with completion status, responsible party, target dates | JSON |
| File | Description | Type |
|---|---|---|
| diagrams/dr-capital-plumbing-map.md | DR capital plumbing map — end-to-end flow: sponsor → HoldCo → SPVs → project → revenue → waterfall → distributions | MD |
| diagrams/fideicomiso-workflow.md | Fideicomiso workflow — SIMV trust creation → asset transfer → cashflow collection → distribution → reporting cycle | MD |
| diagrams/green-bond-issuance-workflow.md | Green bond issuance — mandate → structuring → SPO → marketing → pricing → settlement → reporting | MD |
| diagrams/seven-year-timeline-exit.md | 7-year timeline — development → construction → COD → stabilization → operational → exit preparation → disposition | MD |
| File | Description | Type |
|---|---|---|
| docs/environmental/README.md | Environmental index — EIA, environmental licenses, monitoring plans, biodiversity assessments, water management | MD |
| docs/financial/README.md | Financial documentation index — budgets, projections, term sheets, closing memos, audit reports | MD |
| docs/technical/README.md | Technical documentation index — engineering specifications, grid studies, BESS documentation, panel specs, inverter data | MD |
| docs/land/README.md | Land documentation index — title certificates, cadastral surveys, appraisals, easements, environmental site assessments | MD |
| docs/legal/README.md | Legal documentation index — corporate formation, project contracts, securities, multilateral compliance | MD |
| File | Description | Type |
|---|---|---|
| export/audit_bundle.js | Audit bundle generator — generateBundle() → JSON snapshot (meta + config + models + covenants + governance + data_room + capital + acquisition) · exportBundle() → .json + .sha256 · verifyBundle() | JS |
| scripts/generate-report.js | Report generator — automated PDF/HTML report generation from financial model outputs, formatting, charts, executive summary compilation | JS |
| File | Description | Type |
|---|---|---|
| SunFarm Photovoltaica Project.jpg | Primary satellite view — complete project footprint, Baní DR | IMG |
| SunFarm Photovoltaica Project-2.jpg | Satellite view — zoomed boundary, access roads | IMG |
| SunFarm Photovoltaica Project-3.jpg | Satellite view — terrain features, topography | IMG |
| SunFarm Photovoltaica Project-4.jpg | Satellite view — adjacent infrastructure, road network | IMG |
| SunFarm Photovoltaica Project-5.jpg | Satellite view — vegetation coverage, land use patterns | IMG |
| SunFarm Photovoltaica Project-6.jpg | Satellite view — region context, Galión area | IMG |
| SunFarm Photovoltaica Project-7.jpg | Satellite view — wider area, municipal boundaries | IMG |
| SunFarm Photovoltaica Project-8.jpg | Satellite view — POI interconnection area, 138kV line route | IMG |
| SunFarm Photovoltaica Project-9.jpg | Satellite view — overlay with boundary markers | IMG |
| SunFarm Photovoltaica Project-10.jpg | Satellite view — detail section of project area | IMG |
| SunFarm Photovoltaica Project-11.jpg | Satellite view — northern section, boundary delineation | IMG |
| SunFarm Photovoltaica Project-12.jpg | Satellite view — southern section, drainage patterns | IMG |
| 1.png | Supplementary aerial — project overview image 1 | IMG |
| 2.png | Supplementary aerial — project overview image 2 | IMG |
| 3.png | Supplementary aerial — project overview image 3 | IMG |
| 4.png | Supplementary aerial — project overview image 4 | IMG |
| 5.png | Supplementary aerial — project overview image 5 | IMG |
| 6.jpg | Supplementary aerial — project overview image 6 | IMG |
| File | Description | Type |
|---|---|---|
| PARCELA NO. 59 DC 8 BANI Land Title.pdf | Official land title — Parcela No. 59, Distrito Catastral 8, Baní · Certificate No. 0500009639 · 440.68 hectares · Issued by Jurisdicción Inmobiliaria · Used for mortgage registration and security package | PDF TITLE |
| Certificacion de No Superposicion (Terreno Bani).pdf | No-superposition certification — confirms no overlapping land claims, liens, or competing titles on the Baní parcel. Required for lender comfort and title insurance qualification | PDF CERT |
| File | Description | Type |
|---|---|---|
| TASACION BAni Cerca de Galion 2025.pdf | 2025 land appraisal (TASACIÓN) — independent valuation near Galión, Baní · Establishes current FMV · Supports $35M acquisition pricing (26.9% discount to appraised $47.9M) | PDF 2025 |
| Bani survey sheet 2020.pdf | 2020 cadastral survey — boundary coordinates, area measurement (440.68 ha), topographic features, access points, neighboring parcels |
| File | Description | Type |
|---|---|---|
| 1-Listados Documentos.jpeg | Document listing index — photographic record of master document inventory | IMG |
| A-CNE-CP-0012-2020 Sun Farmin Dominican Republic SRL 20 Abril 2020.pdf | CNE DEFINITIVE CONCESSION — Concesión Provisional CNE-CP-0012-2020 granted April 20, 2020, for 50 MW solar PV generation. Issued by Comisión Nacional de Energía to Sun Farming Dominican Republic SRL | PDF PERMIT |
| B-Carta a CNE 18-01-2024.pdf | Letter to CNE — January 18, 2024 correspondence regarding concession renewal/continuation, regulatory engagement confirmation | |
| C-SNFRM Official Concesion Contract 2023.pdf | OFFICIAL CONCESSION CONTRACT — Binding concession contract 2023 between CNE and Sunfarming Dom Rep Invest SRL · Full terms, obligations, performance targets, penalties, force majeure, governing law | PDF CONTRACT |
| D-No objeción ETED SF Feb 2024.pdf | ETED NO-OBJECTION — February 2024 · Empresa de Transmisión Eléctrica Dominicana confirms no-objection to interconnection at designated point of interconnection (138kV, 4.5km) | PDF PERMIT |
| E-ETED Informe tecnico revalidacion May 2025.pdf | ETED REVALIDATION 2025 — Technical report for no-objection revalidation, May 2025 · Agro-energetic and innovative complex for generation · Updated grid impact study · Reconfirms POI viability | PDF 2025 |
| F-Certificacion de No Superposicion (Terreno Bani).pdf | No-superposition certification — confirms clean title with no overlapping claims on Baní parcel | |
| G-PARCELA NO. 59 DC 8 BANI Land Title.pdf | Land title — Parcela No. 59 DC-8 Baní · 440.68 ha · Certificate 0500009639 | |
| H-LARED Executive Summary PV Sunfarm Bani Final.pdf | LARED executive summary — independent technical assessment of PV Sunfarm Baní project viability, yield analysis, resource assessment | |
| I-LARED to TERRABLU Executive Summary PV Sunfarm Bani Final.pdf | LARED→TERRABLU executive summary — comprehensive engineering viability report, irradiance analysis, energy yield projections, environmental screening | |
| J-SUNFARMING DOM REP INVEST OpenCorporates.pdf | OpenCorporates legal entity record — Sunfarming Dom Rep Invest SRL · RNC 1-31-94471-1 · Mercantil 158067-SD · Registered directors · Company status: active | |
| K-Sunfarming Food & Energy – Comisión Nacional de Energía.pdf | CNE public registry listing — Sunfarming Food & Energy listed on Comisión Nacional de Energía website as registered energy concessionaire |
| File | Description | Type |
|---|---|---|
| TOP-LEVEL REPORTS | ||
| Executive Summary PV Sunfarm Bani Final.pdf | Executive summary report — comprehensive PV project assessment, financial projections, technical specifications | |
| Informe tecnico revalidacion No Objecion.pdf | Technical report for interconnection no-objection revalidation — agro-energetic and innovative generation complex | |
| PV-Heinsberg_1170-780.jpeg | Sunfarming reference project — Heinsberg PV installation photograph, operational proof-of-concept | IMG |
| 140 MW FINAL DESIGN — Professional Engineering Layout | ||
| 140 Meg (Limpio).png | Final 140 MW design — clean layout drawing showing panel array placement, inverter stations, substation location, access roads | IMG |
| Jairo Peña 161.5 MWac REP DOMINICANA-140 meg LAYOUT.pdf | PROFESSIONAL ENGINEERING LAYOUT — 161.5 MWac detailed design by Jairo Peña · Complete engineering drawings · Panel arrays, combiner boxes, inverter pads, collection system, substation, T-line route · Construction-grade detail level | PDF ENGR |
| 3D TERRAIN VISUALIZATION — 140 MW Design | ||
| Vistas Diseño 3d-1.png | 3D terrain render — perspective view 1, panel arrays on topography | IMG |
| Vistas Diseño 3d-2.png | 3D terrain render — perspective view 2, aerial angle | IMG |
| Vistas Diseño 3d-3.png | 3D terrain render — perspective view 3, substation area | IMG |
| Vistas Diseño 3d-4.png | 3D terrain render — perspective view 4, complete project overview | IMG |
| SATELLITE AREA MAPS — Precise Area Measurement | ||
| Diseño 140 Mega (1,114,252 Mts2).png | Satellite map — 140 MW design area: 1,114,252 m² (111.4 ha) of active PV deployment footprint | IMG |
| Diseño 140 Mega (1,114,252 Mts2)-B.png | Satellite map — alternate view of 140 MW layout with boundary overlay | IMG |
| Diseño 140 Mega (1,114,252 Mts2)-C.png | Satellite map — 140 MW design area detail with grid overlay | IMG |
| Area a Comprar Sugerida (1,300,016 Mts2).png | Suggested acquisition area — 1,300,016 m² (2,067.43 tareas) · Includes buffer zones, access corridors, and future expansion | IMG |
| 100 MW DESIGN PACKAGE — Alternative Layout | ||
| Jairo Peña REP DOMINICANA (99 MW)_LAYOUT.pdf | 99 MW engineering layout — professional design by Jairo Peña, alternative configuration for Phase 1 | |
| Diseño Final Entregar a Bodden.png | Final 100 MW design — clean delivery version | IMG |
| Final Pict.png | Final picture — 100 MW design overview render | IMG |
| Foto Final Diseño Paneles Grupo Embajador.png | Final panel design — Grupo Embajador area, panel array configuration | IMG |
| GOOGLE EARTH OVERLAYS — 100 MW Terrain Design | ||
| Terreno diseñado sobre comprado.png | Google Earth — designed area overlaid on purchased parcel boundary, showing fit | IMG |
| Terreno Firmado Compra.png | Google Earth — signed purchase area, contract boundary | IMG |
| todos.png | Google Earth — combined overlay, all parcels and design areas together | IMG |
| File | Description | Type |
|---|---|---|
| OFFICIAL PERMITS & DATA | ||
| CNE-CP-0012-2020 Sun Farmin Dominican Republic SRL.pdf | CNE concession permit — definitive concession CNE-CP-0012-2020 for solar generation | PDF PERMIT |
| official Concesion Contract.pdf | OFFICIAL CONCESSION CONTRACT — binding agreement with CNE, all terms and conditions | PDF CONTRACT |
| Decreto 517-25.pdf | GOVERNMENT DECREE 517-25 — presidential/governmental decree supporting project development framework and renewable energy deployment | PDF DECREE |
| No objeción ETED SF.pdf | ETED no-objection — original interconnection approval for Parque Solar Sunfarming | |
| Revalidación No Objeción Interconexión.pdf | INTERCONNECTION REVALIDATION — updated 2025 revalidation of no-objection for grid interconnection at designated POI | PDF 2025 |
| Carta CNE 18-01-2024.pdf | CNE correspondence — January 2024 letter regarding concession status and regulatory compliance | |
| Sunfarming Food & Energy – CNE.pdf | CNE public registry — Sunfarming listing on Comisión Nacional de Energía official website | |
| INTERCONNECTION REVALIDATION (NEW APPROVAL) | ||
| Informe técnico revalidación (Nueva Aprobación).pdf | New approval — technical report for interconnection no-objection revalidation, innovative agro-energetic generation complex | |
| Revalidación No Objeción (Nueva Aprobación).pdf | Updated revalidation — formal no-objection renewal for Parque Solar Sunfarming Food y Energy interconnection | |
| CORPORATE DATA & HISTORICAL RECORDS | ||
| SUNFARMING DOM REP INVEST OpenCorporates.pdf | OpenCorporates corporate record — entity status, registration details, directors, filing history, RNC verification | |
| CNE-CP-0012-2020 (Corporate DATA copy).pdf | CNE concession — corporate file copy for internal records | |
| Bani survey sheet 2020 (contract copy).pdf | Survey sheet — 2020 cadastral survey included with historical contract records | |
| PV-Heinsberg (contract copy).jpeg | Sunfarming reference project — Heinsberg installation (historical file) | IMG |
| PHOTO-2022-06-17 (1).jpg | Site photograph — June 2022, project area documentation | IMG |
| PHOTO-2022-06-17 (2).jpg | Site photograph — June 2022, terrain features documentation | IMG |
| File | Description | Type |
|---|---|---|
| KMZ MAPPING FILE | ||
| 6E20B66B-5FB4-45E7-ABDA-57334C216950.kmz | KMZ flight mapping file — drone flight path, geofence boundary, waypoints. Opens in Google Earth / QGIS for precise geospatial analysis of survey coverage | KMZ |
| ORTHOMOSAIC PHOTOGRAPHS — 302 High-Resolution Images | ||
| Orthomosaic-Photos/ (302 JPGs) | 302 DJI orthomosaic photographs — DJI_20250911134309_0030_D.JPG through DJI_20250911140112_0333_D.JPG · f/2.8, 140mm, ISO 110 · GPS-tagged · Altitude 31.5m relative / 122m absolute · Full site coverage for terrain analysis, vegetation mapping, and construction planning | IMG×302 |
| DRONE VIDEO & TELEMETRY | ||
| Tutorial sobre como subir fotos al Mapa.mp4 | Tutorial video — guide for uploading orthomosaic photos to mapping platform | MP4 |
| DJI_20250911134305_0030_D_s.MP4 + .LRF + .SRT | Drone video flight 1 — full HD + low-res reference + SRT telemetry (GPS 18.300858°N, 70.361325°W, altitude data, timestamps) | MP4+SRT |
| DJI_20250911135032_0031_D_s.MP4 + .LRF + .SRT | Drone video flight 2 — continued survey coverage + telemetry | MP4+SRT |
| DJI_20250911135738_0032_D_s.MP4 + .LRF + .SRT | Drone video flight 3 — final survey pass + telemetry data | MP4+SRT |