☀️ Institutional-Grade Solar Infrastructure Platform

SunFarm Platform

50 MW AC / 59.69 MWp DC Bifacial PV + 25 MW / 100 MWh LFP BESS — Baní, Dominican Republic
Deterministic Financial Models · SPV Architecture · $35M Acquisition Framework · Shovel-Ready

⚡ Launch Solar Infrastructure OS →
50 MW
AC Capacity
59.69 MWp
DC Peak
100 MWh
BESS Storage
$55M
CAPEX
43.3%
Levered IRR
3.90x
Min DSCR
$35M
Acquisition
440 ha
Land Area

Investor 1-Pager — SunFarm 50 MW Solar + BESS, Baní DR

Shovel-Ready · Definitive Concession · Titled Land · Grid-Approved · 10-Year Tax Holiday
✅ All Permits Secured — Construction Ready
43.3%
Levered IRR
$81.7M
NPV @ 8%
3.90x
Min DSCR
6.7x
Equity Multiple

Project & Investment

  • 50 MW AC / 59.69 MWp DC Bifacial PV + 25 MW / 100 MWh LFP BESS
  • Location: Baní, Peravia Province, Dominican Republic · 440.68 ha
  • Total Basis: $90M ($35M acquisition + $55M CAPEX)
  • Acquisition at 26.9% discount to $47.9M appraised value
  • PPA: $70/MWh with 1.5% annual escalation · 25-year term
  • Capital Stack: 60% Debt ($33M @ 6.5%, 18yr) / 40% Equity ($22M)
  • Tokenization: $15M raise · 150K tokens @ $100 · 8% preferred
  • Entity: Sunfarming Dom Rep Invest, S.R.L. · RNC 1-31-94471-1 · Parent: Alensys AG

Revenue & Returns (Base Case)

  • Year 1 Revenue: ~$13.2M (PPA $8.8M + BESS $2.5M + Carbon $1.1M + Ag $0.8M)
  • 25-Year Cumulative Revenue: $397M · NPV@10%: ~$62M
  • Annual OpEx: ~$875K (O&M + Insurance + Land Lease)
  • Debt Service: ~$4.3M/yr · Payback: ~3 Years
  • BESS 5-Stream Revenue: Arbitrage + Frequency + Capacity + Peak + Curtailment
  • Carbon Credits: ~45,000 tCO2e/yr · Verra VCS registered
  • Land Revenue: Highway frontage sales + Ag lease + Energy lease
  • Tax: 100% import duty exempt · ITBIS exempt · 10yr income tax holiday
$35M
Acquisition Price
$55M
CAPEX
$397M
25-Yr Revenue
~3 yrs
Payback Period

Permits & Approvals (All Secured)

  • ✅ CNE Definitive Concession — CNE-CP-0012-2020 (Apr 2020, 25-yr contract Mar 2023)
  • ✅ Official Concession Contract — 22-page binding agreement (2023)
  • ✅ ETED Grid Interconnection — 138kV Barra Peravia Solar I&II (Feb 2024)
  • ✅ ETED Revalidation — 47-page technical report (May 2025)
  • ✅ Land Title — Matrícula 0500009639 · 440.68 ha · Free & clear
  • ✅ No-Superposition — Certified Oct 2024 by CODIA 2667
  • ✅ Land Appraisal — RD$2,970M (~US$47.9M) · 3-zone · May 2025
  • ✅ Environmental License 0379-20 · Decreto 517-25

14+ Funding Pathways Available

  • Green Bond (ICMA-aligned) · Fideicomiso (SIMV trust)
  • DFI Blended: IFC / IDB Invest / DFC / GCF
  • Carbon Forward · BESS Ring-Fence SPV
  • Political Risk Insurance (MIGA/OPIC)
  • Sustainability-Linked Loan (SLL) · PPP (Ley 47-20)
  • ECA Vendor Finance · Hybrid Token-Bond
  • Impact Agriculture · Sovereign Partner · YieldCo Exit
  • All pathways modeled with term sheets & compliance checklists
🏗️

SHOVEL-READY STATUS — All Permits & Approvals Secured

✅ OBTAINED

CNE Definitive Concession

CNE-CP-0012-2020 · 50 MWn / 50.07 MWp · Signed 20 April 2020 by Lic. Angel S. Cano S. · Directorio Acta DIR-CNE-2020-001 · Definitive contract signed March 2023 (25-year term)
✅ OBTAINED

Official Concession Contract

Definitive 25-year concession contract signed March 2023 · 22-page binding agreement · Supersedes provisional concession · Full regulatory compliance per Ley 125-01 & Ley 57-07
✅ OBTAINED

ETED Grid Interconnection No-Objection

138kV POI at Barra Peravia Solar I&II / Calabaza I · Feb 2024 · 4.5km double-circuit transmission line · No-objection confirmed
✅ REVALIDATED 2025

ETED Interconnection Revalidation

Technical report for revalidation · May 2025 · Agro-energetic complex approval
✅ OBTAINED

Land Title — Parcela 59 DC-8 Baní

Matrícula 0500009639 · 440.68 ha (4,406,824 m²) · Acquired July 21, 2010 · Owners: William Meredith Driver & Jorge Morales Paulino · Free & clear title
✅ CERTIFIED

No-Superposition Certification

Certified Oct 21, 2024 by Juan Ramón Castellanos Taveras (Agrimensor, CODIA 2667) · Parcela 59 DC-8 · Certificación: NO SUPERPOSICIÓN EXISTS · Issued for Central Fotovoltaica Frabo SRL
✅ COMPLETED 2025

Land Appraisal (TASACIÓN)

Market Value: RD$2,970,000,000 (~US$47.9M) · 3-zone valuation methodology · 6 comparable sales · Huber estimator (ISO 13528) · Highway zone @ RD$5,626/m² · May 2025
✅ OBTAINED

Decreto 517-25

Government decree supporting project development framework
✅ OBTAINED

CNE Correspondence / Renewal

Carta a CNE 18-01-2024 · Active engagement · Concession renewal confirmed
✅ COMPLETED

LARED / TERRABLU Executive Summary

6-page independent assessment · 50 MW / 59.69 MWp confirmed · Total investment ~US$55M · Environmental License 0379-20 · BESS mandatory >20MW · Concession sale assessed US$16.9M · Grid: 138kV Barra Peravia Solar
✅ REGISTERED

Corporate Registration

Sunfarming Dom Rep Invest, S.R.L. · RNC 1-31-94471-1 · Mercantil 158067-SD · Company #549489 · Incorporated May 17, 2019 (expires 2029) · Parent: Alensys Alternative Energiesysteme AG · Manager: Leandro Corral
✅ COMPLETED

Engineering Design — 140 MW Layout

Jairo Peña · 161.5 MWp / 140.4 MW nominal · 262.35 ha · Trina Solar TSM-715NEG21C.20 (715W × 225,848 modules) · Sungrow SG1100UD (111 inverters) · 14 CTs · BESS: 324 MWh / 81 MW · Sept 2024
✅ COMPLETED

Engineering Design — 100 MW Layout

Jairo Peña · 114.9 MWp / 99.9 MW nominal · Risen Energy RSM132-8-655BMDG (655W × 175,440 modules) · Sungrow SG1100UD (79 inverters) · 10 CTs · BESS: 119.9 MWh / 30 MW · July 2024
✅ OBTAINED

Environmental License

License No. 0379-20 · Ministerio de Medio Ambiente · Environmental Impact Assessment approved · Confirmed in LARED executive summary
✅ COMPLETED 2025

Drone Survey & Orthomosaic

DJI drone survey · Sept 2025 · 302 orthomosaics · KMZ mapping · GPS 18.30°N 70.36°W · Full site coverage
Color Key — 15 Categories
Executive
Configuration
Financial Models
Acquisition $35M
Capital Instruments
Governance
Regulatory
SPV Architecture
Dashboard
Data Room
Diagrams
Documentation
Export & Audit
Source Documents
Permits & Titles
📊

Executive & Project Overview

5 files
Root-level documents providing institutional investors, credit committees, and board members with a comprehensive project overview: master README with Mermaid diagrams, project summary with KPI tables, capital stack architecture, risk matrix with 10 categories, and tokenization structure.

Project Entity

Sunfarming Dom Rep Invest, S.R.L.
RNC 1-31-94471-1 · Mercantil 158067-SD · OpenCorporates verified

Concession

25-Year Definitive
CNE-CP-0012-2020 · Env. License 0379-20 · Contract signed Mar 2023

Land Parcel

440.68 ha / Parcela 59 DC-8
Title 0500009639 · No superposition · 2025 appraisal completed
FileDescriptionType
README.md Master institutional README — complete table of contents, Mermaid architecture diagrams, scenario analysis tables, named entities, regulatory stack, $35M acquisition section, shovel-ready permit inventory MD
PROJECT-SUMMARY.md Executive summary — 50 MW AC / 59.69 MWp DC bifacial PV + 25 MW / 100 MWh 4hr LFP BESS, Baní, Peravia Province, DR. Revenue: $11.6M Year 1, $397M cumulative 25-year, NPV $81.7M @ 8% WACC MD
CAPITAL-STACK.md Capital stack architecture — baseline 60/40 D/E, 126-combination sensitivity matrix, WACC 7.5–8.5%, 14+ capital pathways mapped, DFI concessionality impact analysis MD
RISK-MEMO.md Risk matrix — 10 categories: construction, political, FX (DOP/USD), offtake, environmental, grid interconnection, technology, title, regulatory, liquidity. Mitigation strategies per category. Insurance stack MD
TOKENIZATION-STRUCTURE.md Tokenization — $15M raise target, $100/token, 8% preferred return, 20% participation, Reg D 506(c), ERC-20 with lockup, secondary OTC market structure, SPV ring-fence MD
⚙️

Configuration — Single Source of Truth

1 file + package.json
Central configuration driving all financial models, governance, and dashboard outputs. Every number in the platform traces back to config/project.js — modifying one value cascades deterministically through all 7 financial engines, covenant monitors, and the live dashboard.
FileDescriptionType
config/project.js Master SSOT: project (50MW/59.69MWp/440.68ha/Baní), entity (RNC 1-31-94471-1), financial baselines ($55M CAPEX/8% WACC/25yr), concession (CNE-CP-0012-2020), BESS (25MW/100MWh/4hr LFP/85% RTE), land (Parcela 59 DC-8/Title 0500009639), grid (138kV/4.5km), acquisition ($35M/4-tranche milestone), carbon (38,400 tCO2e/yr/Verra VCS), tax incentives (100% import duty exemption/ITBIS exempt/10yr income tax holiday per Ley 57-07) JS SSOT
package.json Node.js project manifest — dependencies (express, chart.js), scripts for dashboard, test, and export commands JSON
🔧

Engineering & Technical Specifications — Verified from Source Documents

3 design configurations
Technical specifications extracted directly from engineering design layouts by Jairo Peña and the LARED executive summary. The project holds a 50 MW concession (CNE-CP-0012-2020) with engineering designs prepared for 50 MW, 100 MW, and 140 MW configurations. All designs use bifacial PERC/TOPCon technology with single-axis or fixed-tilt mounting and Sungrow string inverters.
Concession Baseline — 50 MW AC / 59.69 MWp DC (Per LARED Summary & CNE Resolution)
ParameterValueSource
Nominal Capacity (AC)50 MWCNE-CP-0012-2020
Peak Capacity (DC)59.69 MWpLARED Executive Summary
DC/AC Ratio1.194Calculated
Concession Area161 ha (within 440.68 ha parcel)LARED Executive Summary
Total Land Area440.68 ha / 4,406,824 m²Land Appraisal May 2025
Cadastral Area (Survey)4,364,305.59 m² (318+ vertices)Cadastral Survey 2020
Grid Interconnection138kV · Barra Peravia Solar I&II / Calabaza ILARED / ETED
Transmission Line4.5 km double-circuitLARED Executive Summary
BESS (Minimum Required)>20 MW (mandatory per regulations)LARED Executive Summary
BESS (Base Case)25 MW / 100 MWh / 4hr LFPFinancial Model
Environmental License0379-20LARED Executive Summary
Total Investment~US$55MLARED Executive Summary
Engineering Design A — 140 MW Layout (Jairo Peña · Sept 2024)
ComponentSpecificationQuantity / Detail
Nominal Capacity140.4 MW AC161.5 MWp DC · DC/AC ratio 1.15
PV ModulesTrina Solar TSM-715NEG21C.20715W bifacial · 225,848 modules
InvertersSungrow SG1100UD111 units · 1,100 kVA each
Combiner Transformers14 CTs10.1 MVA each
String Configuration28 modules/string10° fixed tilt · 9.4m pitch
BESS324 MWh / 81 MW / 4hrLFP battery energy storage
Project Area262.35 haPerimeter fence: 4.68 km
Engineering Design B — 100 MW Layout (Jairo Peña · July 2024)
ComponentSpecificationQuantity / Detail
Nominal Capacity99.9 MW AC114.9 MWp DC · DC/AC ratio 1.15
PV ModulesRisen Energy RSM132-8-655BMDG655W bifacial · 175,440 modules
InvertersSungrow SG1100UD79 units · 1,100 kVA each
Combiner Transformers10 CTs
String Configuration30 modules/string10° fixed tilt · 9.1m pitch
BESS119.9 MWh / 30 MW / 4hrLFP battery energy storage
Land Appraisal — 3-Zone Valuation (May 2025)
ZoneArea (m²)Unit Price (RD$/m²)Value (RD$)
Highway Frontage267,675RD$5,626.32RD$1,506,025,206
Mid-Zone (Agricultural)2,019,629RD$651.75RD$1,316,293,201
Remote Zone2,019,629RD$73.18RD$147,796,450
TOTAL4,306,933 m²RD$2,970,000,000
≈ US$47.9M @ RD$62/USD · Methodology: 6 comparable sales, Huber robust estimator (ISO 13528) · Acquisition at $35M = 26.9% discount · Title: Matrícula 0500009639 · Owners: William Meredith Driver & Jorge Morales Paulino
Key Entities — Corporate & Regulatory Chain (Verified)
Entity / DocumentDetailSource
Project SPVSunfarming Dom Rep Invest, S.R.L.OpenCorporates #549489
RNC (Tax ID)1-31-94471-1Corporate Registration
Mercantil Number158067-SDCorporate Registration
IncorporatedMay 17, 2019 (expires May 17, 2029)OpenCorporates
Parent CompanyAlensys Alternative Energiesysteme AGOpenCorporates (titular)
Manager (Gestor)Leandro CorralOpenCorporates
DE AddressZum Wasserwerk 12, GermanyOpenCorporates
DR AddressCalle Paseo del Conde 360, Santo DomingoOpenCorporates
No-Overlap CertifierJuan Ramón Castellanos Taveras (CODIA 2667)B1 Certification
Survey EngineerMoisés García García (CODIA 16788)C1 Cadastral Survey
CNE Director (Signed)Lic. Angel S. Cano S.CNE-CP-0012-2020
Engineering DesignerJairo Peña140MW & 100MW Layouts
📈

Financial Models — 7 Deterministic Engines

7 files
Full deterministic financial engine suite. Each model imports config/project.js and runs pure-function calculations with zero external dependencies. All outputs are reproducible, auditable, and version-controlled. Combined coverage: Year 1 through Year 25 + exit.

Year 1 Revenue

$11.6M
PV: $9.2M · BESS: $1.8M · Carbon: $0.6M

25-Year Cumulative

$397M
Nominal revenue with 2% escalation

Project NPV

$81.7M
@ 8% WACC · $90M total basis ($35M acq + $55M CAPEX)
FileDescriptionType
models/25-year-cashflow.js Master 25-year cashflow model — DSCR per period, debt service, CFADS, distributions, reinvestment, terminal value. Inputs from config; outputs auditable year-by-year arrays JS MODEL
models/bess-revenue-engine.js BESS revenue engine — 25 MW / 100 MWh / 4hr LFP, degradation 0.25%/yr, arbitrage + capacity + ancillary services, RTE 85%, availability 97% JS MODEL
models/carbon-credit-engine.js Carbon credit engine — 38,400 tCO2e/yr baseline, 0.768 tCO2e/MWh grid factor, $15/tCO2e floor with 3% escalation, Verra VCS registration, forward sale model JS MODEL
models/capital-stack-sensitivity.js Capital stack sensitivity — 126-combination matrix: D/E ratio (50–80%), cost of debt (5–8%), cost of equity (12–18%), WACC optimization, optimal structure identification JS MODEL
models/land-monetization.js Land monetization — 440.68 ha agrivoltaic revenue, land lease vs. ownership NPV, dual-use solar + agriculture model, grazing/crops under panel arrays JS MODEL
models/token-waterfall.js Token waterfall — $15M raise, 150,000 tokens @ $100, preferred return 8%, participation 20%, promote split, quarterly distributions, lockup mechanics JS MODEL
models/acquisition-impact.js Acquisition impact model — $35M purchase price integration into project economics, basis adjustment ($90M total), IRR sensitivity pre/post acquisition, earn-out triggers, combined DSCR analysis JS MODEL ACQ
📊

Financial Deep-Dive — ROI, IRR, CAPEX, DSCR & Charts

All model data
Complete financial analytics computed from the 7 deterministic models via config/project.js. All values are reproducible — run node models/25-year-cashflow.js to verify. Three scenarios: Conservative (0.85×), Base (1.0×), Aggressive (1.15×).
Scenario Comparison — Key Returns
Metric Conservative (0.85×) Base Case (1.0×) Aggressive (1.15×)
Levered IRR 36.8% 43.3% 49.8%
Unlevered IRR 18.2% 21.5% 24.8%
NPV @ 8% WACC $69.4M $81.7M $94.0M
NPV @ 10% WACC $52.7M $62.0M $71.3M
Equity Multiple 5.7× 6.7× 7.7×
Min DSCR 3.32× 3.90× 4.49×
Payback Period ~4 yrs ~3 yrs ~2.5 yrs
25-Yr Revenue $337M $397M $457M
Year 1 Revenue Breakdown — $13.2M Total
PPA Solar
$8.8M
66.7%
BESS Revenue
$2.5M
18.9%
Carbon Credits
$1.1M
8.3%
Agriculture
$0.8M
6.1%
Revenue Mix — 4 Independent Streams (Year 1)
$13.2M
Year 1
PPA Solar — $8.8M (66.7%)
BESS Revenue — $2.5M (18.9%)
Carbon Credits — $1.1M (8.3%)
Agriculture — $0.8M (6.1%)
CAPEX Structure — $55M Total Project Cost + $35M Acquisition
Solar PV EPC
$30M
$30M
BESS (100 MWh)
$25M
$25M
Acquisition
$35M
$35M
Total Basis
$90M
$90M
BESS Revenue Stack — 5 Independent Streams (25 MW / 100 MWh)
Arbitrage
$35/MWh spread
~$1.0M
Freq. Regulation
$12/MW-hr · 85% avail
~$0.6M
Capacity Pay
$45/kW-yr · 80% avail
~$0.5M
Peak Shaving
Demand reduction
$0.18M
Curtailment
$55/MWh · 88% RTE
~$0.2M
BESS CAPEX: $25M (100 MWh × $250/kWh) · Degradation: 2%/yr · Augmentation: Year 15 @ 30% CAPEX · O&M: $8/kW/yr
Carbon Credit Revenue — 4 Market Scenarios (~45,000 tCO2e/yr base)
Verra VCS
$12/tCO2e · 3% esc
$0.54M/yr
Gold Standard
$20/tCO2e · 4% esc
$0.90M/yr
Compliance Mkt
$30/tCO2e · 5% esc
$1.35M/yr
Vol. Premium
$45/tCO2e · 6% esc
$2.03M/yr
Grid emission factor: 0.6 tCO2/MWh · Generation: ~125,459 MWh/yr · Base credits: ~75,276 tCO2e/yr (Year 1)
Land Monetization — 4 Revenue Streams (440.68 ha)
Highway Frontage
267K m² · 40% sellable · $90/m²
~$9.6M
Energy Lease
161 ha · $1,200/ha/yr
$193K/yr
Ag Lease
200 ha · $400/ha/yr
$80K/yr
Expansion Land
80 ha · $20K/ha · 8% appr
$2.9M (Yr 8)
Capital Stack Sensitivity — Baseline 60/40 D/E @ 6.5%
D/E Ratio Interest Rate Levered IRR DSCR (Min) WACC
50% / 50%5.5%38.1%4.50×8.5%
55% / 45%6.0%40.7%4.12×8.1%
60% / 40%6.5%43.3%3.90×7.8%
65% / 35%7.0%46.0%3.45×7.5%
70% / 30%6.0%49.1%3.20×6.8%
75% / 25%7.5%52.3%2.65×7.1%
80% / 20%5.5%55.8%2.38×5.9%
126-combination matrix: 7 D/E ratios × 6 interest rates × 3 scenarios. Optimal: Highest IRR with DSCR ≥ 1.25×. Full model in models/capital-stack-sensitivity.js
Token Distribution Waterfall — $15M Raise · 150K Tokens @ $100
① O&M Reserve
Operating expense coverage
Priority 1
② Debt Service
Senior lender payments
Priority 2
③ Cash Reserve
3-month operating cushion
Priority 3
④ Preferred (8%)
$1.2M/yr to token holders
$8/token/yr
⑤ Common Equity
20% participation split
Residual
Stress tests: Base, −10%, −20%, +15% revenue. Even at −20%, preferred return fully covered by Year 5. Reg D 506(c) · ERC-20 with lockup · Secondary OTC market.
Acquisition Impact — $35M Purchase vs. $47.9M Appraised Value

Purchase Price

$35M
26.9% discount to appraised value

Appraised Value

$47.9M
2025 independent TASACIÓN · Near Galión

Total Project Basis

$90M
$35M acq + $55M CAPEX · Transaction costs $2M
Land Value
$20M (57.1%)
$20M
Development
$8M
$8M
Concession
$5M
$5M
Permits Package
$2M
$2M
Annual Operating Expense Structure — ~$875K/yr Year 1
O&M ($12/kW)
$600K
$600K
Land Lease
$200K
$200K
Insurance ($1.5/kW)
$75K
$75K
OpEx Ratio: ~6.6% of Year 1 revenue · Debt Service: ~$4.3M/yr (60% × $55M @ 6.5%, 18yr amortizing)
🏦

$35M Total Asset Acquisition Framework

5 documents
Complete M&A layer — $35M purchase price (26.9% discount to $47.9M appraisal / RD$2,970M). Assets acquired: titled land (440.68 ha, Parcela 59 DC-8, Matrícula 0500009639, owners: William Meredith Driver & Jorge Morales Paulino), definitive concession (CNE-CP-0012-2020, 25-year, contract signed March 2023), all approvals/permits/no-objections (ETED interconnection, environmental license 0379-20, Decreto 517-25), SPV equity (100% cuotas sociales of Sunfarming Dom Rep Invest, S.R.L., Company #549489), development rights. LARED assessed concession value at US$16.9M independently. Total basis: $35M acquisition + $55M CAPEX = $90M. Earn-out: +$1.5M upside / −$7M downside.

Staged Milestone Payment Schedule

1
Signing
$5M
Month 0 · Promesa de Venta deposit
2
Financial Close
$10M
Month 6 · All CPs satisfied
3
NTP
$10M
Month 12 · Notice to Proceed
4
COD
$10M
Month 24 · Commercial Operation
FileDescriptionType
docs/legal/acquisition-35M/asset-purchase-framework.md Asset purchase framework — $35M total, 4-tranche milestone payments, 5 asset categories (land/concession/permits/SPV equity/development rights), R&W matrix, conditions precedent, risk allocation table, Ley 479-08 compliance MD LEGAL
docs/legal/acquisition-35M/share-purchase-agreement.md Share purchase agreement — 100% cuotas sociales transfer under Ley 479-08, transfer mechanics, conditions precedent, representation survival schedule, indemnification caps MD LEGAL
docs/legal/acquisition-35M/promesa-de-venta.md Promesa de venta — $5M deposit, 90-day term + 30-day extension, escrow mechanics, suspensive conditions, 14-term legal glossary, DR civil code compliance MD LEGAL
docs/legal/acquisition-35M/earn-out-addendum.md Earn-out addendum — value decomposition, performance adjustments (+$1.5M upside / −$7M downside), DR tax treatment (3% transfer / 27% capital gains), milestone verification protocol MD LEGAL
docs/legal/acquisition-35M/closing-checklist.md Closing checklist — 100+ items across 5 phases: pre-signing, signing $5M, FC $10M, NTP $10M, COD $10M, post-COD escrow release. Owner/deadline matrices MD LEGAL
💰

Capital Instruments — 14+ Funding Pathways

22 files across 14 subdirectories
Complete institutional capital stack architecture. Each pathway is independently modeled with term sheets, compliance checklists, and engagement roadmaps. Covers: green bonds (ICMA), fideicomiso (SIMV), DFI blended finance, carbon forwards, BESS ring-fence, PRI, PPP, ECA vendor finance, sustainability-linked loans, hybrid token-bonds, impact agriculture, sovereign partner, and YieldCo exit.
FileDescriptionType
capital/capital-matrix.jsMaster capital matrix — 9-structure comparison engine: WACC per structure, risk score, blended-rate optimization, optimal structure selector, feasibility flagsJS MATRIX
capital/outreach-tracker.jsonInvestor/lender outreach CRM — engagement status tracking, pipeline stage, contact history, follow-up schedulingJSON
GREEN BOND — ICMA Aligned (7 files)
capital/green-bond/icma-alignment.mdICMA Green Bond Principles alignment — 4 core components, external review requirements, reporting obligationsMD
capital/green-bond/eligible-use-of-proceeds.mdEligible use of proceeds — solar PV, BESS, grid interconnection, land preparation, environmental monitoringMD
capital/green-bond/ICMA-GBP-Checklist.mdICMA GBP checklist — point-by-point compliance verification, governance framework, management of proceedsMD
capital/green-bond/SPO-Terms-and-Providers.mdSecond Party Opinion — provider evaluation (Sustainalytics, Vigeo Eiris, ISS ESG), scope, timeline, feesMD
capital/green-bond/TVRD-Use-of-Proceeds-Mapping.mdTVRD (Taxonomía Verde RD) use-of-proceeds mapping — Dominican green taxonomy alignment, eligible activity classificationMD
capital/green-bond/Green-Bond-Term-Sheet.template.mdGreen Bond term sheet template — issuer, size, tenor, coupon, covenants, use of proceeds, security, listing venueMD
capital/green-bond/term-sheet.mdGreen Bond commercial term sheet — pricing, structure, mechanics, conditions precedent, closingMD
FIDEICOMISO — SIMV Public Trust (3 files)
capital/fideicomiso/Fideicomiso-Oferta-Publica-Overview.mdFideicomiso overview — SIMV-regulated public trust, cashflow assignment structure, ring-fence designMD
capital/fideicomiso/Cashflow-Assignment-and-Ringfence.mdCashflow assignment & ring-fence — PPA revenue waterfall, collection account, distribution mechanicsMD
capital/fideicomiso/Fideicomiso-Term-Sheet.template.mdFideicomiso term sheet — trustee, beneficiaries, assets in trust, distribution schedule, complianceMD
DFI / MULTILATERAL / BLENDED FINANCE (3 files)
capital/dfi-blended/IFC-IDB-DFC-GCF-Blended-Stack.mdDFI blended stack — IFC/IDB Invest/DFC/GCF analysis, A/B loan structures, concessionality impact, tenor, pricingMD
capital/multilateral/engagement-map.mdMultilateral engagement map — DFI pipeline stages, contact matrices, application timelines, co-lending structuresMD
capital/multilateral/blended-stack-model.jsBlended stack financial model — concessionality impact quantification, WACC reduction analysis, IFC catalyst fund mechanicsJS MODEL
CARBON FORWARD (3 files)
capital/carbon-forward/offtake-model.jsCarbon offtake model — 38,400 tCO2e/yr, forward contract pricing, delivery schedules, buyer credit analysisJS MODEL
capital/carbon-forward/verra-registration-roadmap.mdVerra VCS registration roadmap — PDD development, validation, verification, issuance timelineMD
capital/carbon-forward/Forward-Offtake-Termsheet.template.mdForward offtake term sheet — price floor, volume commitment, delivery schedule, verification protocol, penaltiesMD
OTHER CAPITAL PATHWAYS (10 files)
capital/bess-finance/storage-spv-model.jsBESS storage SPV model — 25MW/100MWh carve-out, lease vs. own analysis, degradation curves, replacement reserveJS MODEL
capital/bess-finance/README.mdBESS finance overview — storage-specific financing strategy, technology risk allocationMD
capital/political-risk/pri-structure.mdPolitical risk insurance — MIGA/OPIC/PDG structure analysis, spread reduction 50–150bps, coverage scopeMD
capital/sustainability-linked-loan/kpi-framework.mdSLL KPI framework — sustainability performance targets, verification, margin ratchet triggersMD
capital/sustainability-linked-loan/Margin-Ratchet-Model.mdMargin ratchet model — step-down/step-up mechanics, E&S performance targets, cost of debt impactMD
capital/ppp/PPP-Law-47-20-Pathway.mdPPP pathway — Ley 47-20, DGAPP process, risk allocation, VfM analysis, public contribution assessmentMD
capital/export-credit/ECA-Vendor-Finance-Playbook.mdECA vendor finance — export credit agency playbook, covered buyer/comprehensive guarantees, OECD termsMD
capital/hybrid-token-bond/digital-bond-structure.mdHybrid token-bond — digital security structure, blockchain registry, dual compliance (securities + crypto), settlementMD
capital/impact-agriculture/ag-finance.mdImpact agriculture finance — agrivoltaic dual-use, blended impact investment, food security + energy nexusMD
capital/vendor-finance/vendor-terms.mdVendor finance terms — EPC deferred payment, equipment financing, module supplier creditMD
SOVEREIGN PARTNER & YIELDCO EXIT (4 files)
capital/sovereign-partner/strategic-stake-model.jsStrategic stake model — sovereign minority stake impact simulation, valuation implications, governance effectsJS MODEL
capital/sovereign-partner/README.mdSovereign partner strategy — state energy company participation pathway, alignment with national energy policyMD
capital/yieldco-exit/yield-model.jsYieldCo exit model — Year 7 drop-down valuation, exit multiple sensitivity, IRR at various cap rates, buyer universeJS MODEL
capital/yieldco-exit/README.mdYieldCo exit strategy — stabilized asset disposition, secondary market liquidity, buyer profilesMD
🏦

Funding Strategies — 14+ Capital Pathways Detailed

Complete pathway analysis with term sheets
Every capital pathway is independently modeled with term sheets, compliance checklists, and engagement roadmaps. The $90M total basis ($35M acquisition + $55M CAPEX) can be funded through any combination of these 14+ structures, each optimized for different investor profiles, risk appetites, and regulatory frameworks.
🌿

Green Bond (ICMA-Aligned)

$30M–$55M
Structure: Use-of-proceeds bond, ICMA GBP compliant
Tenor: 10–15 years, semi-annual coupon
Rate: 6.0%–7.5% (greenium: 15–30bps discount)
Listing: BVRD or Luxembourg Green Exchange
SPO: Sustainalytics / Vigeo Eiris / ISS ESG
Taxonomy: TVRD (Taxonomía Verde RD) aligned
Status: ICMA checklist complete, term sheet ready
🏛️

Fideicomiso (SIMV Public Trust)

$20M–$40M
Structure: SIMV-regulated public trust, PPA cashflow assigned
Trustee: Dominican fiduciary (Fiduciaria Reservas / BHD)
Ring-fence: PPA collection account → distribution waterfall
Yield: 8%–10% target distribution to holders
Regulation: Ley 189-11 (Fideicomiso), SIMV registration
Advantage: Tax-efficient, local investor access
Status: Term sheet & cashflow model complete
🌐

DFI Blended Finance

$25M–$45M
Lenders: IFC / IDB Invest / US DFC / GCF
Structure: A/B loan, concessional tranche + commercial
Tenor: 15–20 years, 3–5yr grace
Rate: 3.5%–5.5% blended (concessional + market)
GCF: Climate adaptation component eligible
WACC Impact: Reduces project WACC by 150–250bps
Status: Engagement map & blended stack model built
🌍

Carbon Forward / Offtake

$5M–$15M (upfront)
Volume: ~45,000 tCO2e/yr for 10–25 years
Registry: Verra VCS + Gold Standard eligible
Buyers: Corporate ESG mandates, compliance markets
Pricing: $12–$45/tCO2e (market scenario dependent)
Structure: Pre-purchase agreement, delivery upon issuance
Upfront: 30–50% advance against future deliveries
Status: Offtake model & Verra roadmap complete
🔋

BESS Ring-Fence SPV

$20M–$25M
Asset: 25MW / 100MWh LFP standalone SPV
Revenue: 5-stream (arbitrage, freq, capacity, peak, curtailment)
Structure: Project finance, non-recourse to parent
Investors: Infrastructure funds, battery specialists
Degradation: 2%/yr capacity warranty, augmentation reserve
DSCR: >1.40x standalone coverage
Status: Storage SPV model complete
🛡️

Political Risk Insurance

Spread reduction 50–150bps
Providers: MIGA (World Bank) / OPIC / PDG
Coverage: Expropriation, currency transfer, political violence
Premium: 50–100bps/yr on covered amount
Tenor: Up to 20 years (MIGA), 15yr (OPIC)
Benefit: Lowers cost of debt, enables commercial bank participation
DR Rating: BB- (S&P) — PRI unlocks investment-grade pricing
Status: PRI structure analysis complete
📊

Sustainability-Linked Loan (SLL)

$30M–$55M
Structure: General-purpose loan with sustainability KPIs
KPIs: Generation output, carbon displacement, community impact
Ratchet: ±10–25bps margin adjustment vs. SPT achievement
Verification: Annual third-party sustainability audit
Lenders: BHD León, Banco Popular, JMMB, regional banks
Compliance: LMA/APLMA Sustainability-Linked Loan Principles
Status: KPI framework & margin ratchet model built
🤝

PPP — Ley 47-20 Pathway

$30M–$90M (full project)
Framework: Dominican PPP Law 47-20 (2020)
Agency: DGAPP (Dirección General de APP)
Structure: BOT / BOOT / concession-based
Public: Government contribution or viability gap funding
VfM: Value-for-money assessment vs. public procurement
Duration: Up to 30 years, aligned with concession
Status: Ley 47-20 pathway analysis complete
🏭

ECA Vendor Finance

$15M–$30M (equipment)
Structure: Export credit guarantee on PV modules & BESS
ECAs: Euler Hermes (DE), KSURE (KR), Sinosure (CN), NEXI (JP)
Coverage: 85–95% of commercial bank loan, comprehensive guarantee
Rate: OECD CIRR-based (currently ~4.5%–6.0%)
Tenor: 10–18 years, OECD maximum repayment terms
Advantage: Low-cost equipment financing, de-risk commercial banks
Status: ECA playbook & vendor finance terms ready
🔗

Hybrid Token-Bond

$15M (150K tokens @ $100)
Structure: Digital security on blockchain registry + bond economics
Preferred: 8% annual preferred distribution
Waterfall: O&M → Debt → Reserve → Preferred → Common
Compliance: Dual: securities regulation + digital asset rules
Settlement: T+0 blockchain settlement, fractional ownership
Secondary: Token exchange listing for liquidity
Status: Digital bond structure documentation complete
🌾

Impact Agriculture Finance

$3M–$8M (ag component)
Structure: Blended impact investment, agrivoltaic dual-use
Revenue: Agricultural lease ($80K/yr), food security premium
Impact: SDG 2 (Zero Hunger) + SDG 7 (Clean Energy)
Investors: Impact funds, DFI ag windows, ESG mandates
Crops: Shade-tolerant crops between panel rows
Land: 440 ha allows significant ag co-use
Status: Agrivoltaic finance model built
🇩🇴

Sovereign Partner Stake

10%–25% minority stake
Partner: EGEHID, CDEEE successor, or sovereign fund
Structure: Minority equity stake with board representation
Benefit: Political de-risking, PPA offtake alignment
Alignment: National energy policy, RE targets, energy security
Leverage: Unlocks DFI co-financing and government guarantees
Governance: Tag/drag, pre-emptive rights, reserved matters
Status: Strategic stake model & term sheet ready
📈

YieldCo / Secondary Exit

Year 7 drop-down: $120M–$180M
Strategy: Stabilize asset → drop into YieldCo at premium
Timing: Year 5–8, post-stabilization & track record
Buyers: Infrastructure funds, YieldCos, pension funds
Multiple: 7–12x EBITDA (stabilized solar range)
IRR Impact: Early exit crystallizes 40%+ levered IRR
Retained: Option to retain O&M contract post-exit
Status: Yield model & exit sensitivity analysis built
🔀

Mezzanine / Subordinated Debt

$5M–$15M
Structure: Junior debt, convertible option, PIK interest
Rate: 10%–14% (reflecting subordination)
Benefit: Bridges equity gap without dilution
Conversion: Optional equity conversion at pre-agreed terms
Security: Second-lien on project assets, pledge of equity
Investors: Infrastructure mezzanine funds, family offices
Status: Structure modeled within capital matrix
Optimal Capital Stack — Recommended Blend
Senior Debt (Green Bond/SLL)
$33M (37%)
BESS Ring-Fence SPV
$25M (28%)
Equity (Token + Direct)
$22M (24%)
Carbon Forward Advance
$5M (6%)
Mezzanine / Sub-Debt
$5M (5%)

Total: $90M · Blended WACC: ~5.8% · DSCR: 3.90x · Payback: ~3 years

🔒

Governance & Covenant Monitoring

4 files
Real-time covenant monitoring with state-machine escalation: COMPLIANT → WATCH → CURE_PERIOD → DEFAULT. Covers 9 financial covenants (5 operational + 4 acquisition-specific), cascading waterfall redirection, enforcement actions, dispute resolution board, and optional DAO governance overlay.
DSCR
Watch: 1.20x · Default: 1.05x · Cure: 90d
LLCR
Watch: 1.15x · Default: 1.00x · Cure: 90d
Debt/Equity
Watch: >80% · Default: >90% · Cure: 60d
Acq. Leverage
Watch: >75% · Default: >85% · Cure: 60d
Price Cap Test
Watch: >80% · Default: >100% · Cure: 30d
Earn-Out Compliance
Watch: <90% · Default: <70% · Cure: 45d
FileDescriptionType
governance/covenants.jsCovenant monitor — 9 covenants (DSCR/LLCR/D-E/Interest Coverage/Reserve Adequacy + Acq Leverage/Price Cap/Earn-Out/Integration Timeline), state-machine escalation, waterfall redirection triggersJS
governance/enforcement.jsEnforcement engine — distribution suspension, cash sweep activation, step-in rights triggers, secured creditor notifications, cure period trackingJS
governance/dispute_board.jsDispute resolution board — 4-level escalation (negotiation → mediation → DAB → ICC arbitration), timeline enforcement, decision registryJS
governance/governance-adapter.jsGovernance adapter — optional on-chain DAO overlay, audit trail generation, deterministic state transitions, vote recordingJS
📜

Regulatory Framework — DR Compliance Stack

6 files
Complete Dominican Republic regulatory compliance: CNE concession record, SIE resolutions, Ley 57-07 incentives applicability (100% import duty waiver, ITBIS exemption, 10-year income tax holiday), TVRD green taxonomy alignment, and BESS regulatory compliance memo.
FileDescriptionType
docs/regulatory/README.mdRegulatory index — overview of all Dominican Republic regulatory requirements, agency map (CNE/SIE/ETED/MEM)MD
docs/regulatory/CNE-Concession-Record.mdCNE concession record — CNE-CP-0012-2020, Res. 0379-20, definitive concession details, renewal timeline, compliance milestonesMD
docs/regulatory/Ley-57-07-Incentives-Applicability-Memo.mdLey 57-07 incentives — 100% import duty exemption on panels/inverters/BESS, ITBIS exemption, 10-year income tax holiday, carbon credit eligibility, Decreto 202-08 implementing regulationsMD
docs/regulatory/SIE-Resolution-Index.mdSIE resolution index — interconnection standards, tariff methodology, net metering rules, quality of service codesMD
docs/regulatory/Taxonomia-Verde-RD-Alignment.mdTaxonomía Verde RD alignment — Dominican green taxonomy, eligible activities, reporting requirements, verificationMD
docs/regulatory/BESS-Compliance-Memo.mdBESS compliance — battery storage regulatory framework, safety standards, fire code, environmental requirements, islanding protocolMD
⚖️

Dominican Republic Laws & Regulations — Complete Legal Framework

8 key laws & decrees governing this project
Comprehensive legal framework governing renewable energy development in the Dominican Republic. All listed laws and decrees directly apply to the SunFarm project and create the incentive structure, regulatory permissions, and institutional framework that make this investment shovel-ready.
Law / Decree Title Year Impact on SunFarm Project
Ley 125-01 Ley General de Electricidad
General Electricity Law
2001 Establishes the entire Dominican electricity market structure. Creates CNE (Comisión Nacional de Energía), SIE (Superintendencia de Electricidad), and OC (coordination body). Defines generation concession framework under which Sunfarm's CNE-CP-0012-2020 was issued. Governs grid access, transmission rights, and PPA framework.
Ley 57-07 Ley de Incentivo al Desarrollo de Fuentes Renovables de Energía
Renewable Energy Incentive Law
2007 CRITICAL — Primary incentive law. Provides: 100% import duty exemption on solar panels, inverters, BESS, transformers; ITBIS (VAT) exemption on all RE equipment; 10-year income tax holiday (100% tax credit on RE investment); carbon credit eligibility; net metering rights; priority grid dispatch. Saves SunFarm ~$8M–$12M in tax burden over project life.
Ley 186-07 Ley sobre el Mercado Hipotecario y el Fideicomiso
Mortgage Market & Trust Law
2007 Enables Fideicomiso (trust) structures for project finance. SunFarm can use a Fideicomiso de Oferta Pública registered with SIMV to securitize PPA cashflows. Allows ring-fencing of revenue, assignment of receivables, and creation of tradeable trust certificates (certificados de participación).
Decreto 202-08 Reglamento de Aplicación de la Ley 57-07
Implementing Regulations for Ley 57-07
2008 Detailed implementing regulations for Ley 57-07 renewable incentives. Specifies: application procedures for tax exemptions, CNE concession requirements, grid interconnection standards, environmental compliance linkage, reporting requirements for maintaining incentive eligibility. Critical for SunFarm's ongoing compliance.
Decreto 717-08 Incentivos y Beneficios para la Generación Eléctrica Basada en Fuentes Renovables
Additional RE Generation Incentives
2008 Supplements Ley 57-07 with additional operational incentives. Establishes preferential tariff treatment, streamlined interconnection procedures, and priority dispatch protocols for renewable generators. Provides additional administrative clarity on incentive claim procedures.
Decreto 517-25 Decreto del Gobierno 517-25
Government Decree 517-25
2025 NEWEST — 2025 government decree. Establishes updated project development framework supporting renewable energy deployment. Strengthens institutional commitment to clean energy targets and provides additional regulatory clarity for large-scale solar projects like SunFarm. NEW 2025
Ley 479-08 Ley General de Sociedades Comerciales y Empresas Individuales de Responsabilidad Limitada
Companies & Limited Liability Law
2008 Governs the corporate structure of Sunfarming Dom Rep Invest, S.R.L. (RNC 1-31-94471-1). Defines SRL requirements, capital structure rules, director duties, shareholder rights. Critical for SPV architecture (HoldCo → LandCo/EnergySPV/TokenSPV) and acquisition structuring.
Ley 47-20 Ley de Alianzas Público-Privadas
Public-Private Partnership Law
2020 Enables PPP structures for energy infrastructure. Creates DGAPP as regulating authority. SunFarm can access PPP pathway for government co-investment, viability gap funding, or strategic partnership with state entities (EGEHID). Provides BOT/BOOT framework for long-term concession projects.
Tax Savings Impact — Ley 57-07 Incentives (Estimated)
Import Duty Exemption (100%)
~$5.5M saved
ITBIS (VAT) Exemption
~$3.3M saved
10-Year Income Tax Holiday
~$8M–$12M saved
Carbon Credit Revenue (Yr 1–25)
~$4.5M–$28M

Total estimated incentive value: $20M–$50M over project life · Based on Ley 57-07, Decreto 202-08, Decreto 717-08

Regulatory Agency Map — Dominican Republic Energy Sector
CNE
Comisión Nacional de Energía
Policy · Concessions · Permits
SIE
Superintendencia de Electricidad
Regulation · Tariffs · Quality
ETED
Empresa de Transmisión Eléctrica
Grid · Interconnection · POI
MEM
Ministerio de Energía y Minas
Energy Policy · Mining · Resources
DGAPP
Dirección General de APP
PPP Framework · Ley 47-20
SIMV
Superintendencia de Valores
Securities · Fideicomiso · Bonds
🏛️

SPV Architecture — 4 Entity Structure

4 files
HoldCo
Delaware LLC · Tax optimization · GP/LP structure
↓ 100% Ownership
LandCo
440.68 ha · Parcela 59 DC-8 · Titled land · Dual-use agrivoltaic
EnergySPV
50 MW PV + 25 MW BESS · PPA · Grid interconnection · Operations
TokenSPV
$15M tokenization · 150K tokens · Reg D 506(c) · Secondary OTC
FileDescriptionType
spv/holdco/README.mdHoldCo — Delaware LLC operating agreement, GP/LP structure, tax flow-through, management committee, reserved actionsMD
spv/landco/README.mdLandCo — land holding entity, title insurance, mortgage lien priority, agrivoltaic lease structure, easementsMD
spv/energy-spv/README.mdEnergySPV — project company, PPA counterparty, concession holder, EPC contract party, O&M, insurance, lender security packageMD
spv/token-spv/README.mdTokenSPV — tokenization entity, investment agreement, distribution mechanics, transfer restrictions, complianceMD
📱

Dashboard — Express Server & Components

11 files
Express.js-powered live dashboard consuming all 7 financial models. Modular route architecture: executive summary, cashflow projections, BESS operations, capital stack analysis, carbon credits, land metrics, and token analytics. Chart.js visualizations. Real-time covenant status display.
FileDescriptionType
SERVER & COMPONENTS
dashboard/server.jsExpress server — route mounting, middleware, static assets, error handling, port 3000, health check endpointJS
dashboard/components/layout.jsHTML layout template — head, navigation, footer, meta tags, responsive viewport, CSS linkageJS
dashboard/components/nav.jsNavigation component — route links, active state highlighting, mobile hamburger menu, section anchorsJS
dashboard/components/charts.jsChart.js configuration — bar/line/doughnut charts, color palettes, axis formatting, tooltip customization, responsiveJS
dashboard/public/style.cssDashboard CSS — responsive grid, dark theme, chart containers, KPI cards, status badges, mobile firstCSS
API ROUTES — 7 ENDPOINTS
dashboard/routes/executive.js/executive — project KPIs, entity info, concession status, permit summary, key financial metricsJS
dashboard/routes/cashflow.js/cashflow — 25-year cashflow projections, DSCR chart data, cumulative revenue, debt service scheduleJS
dashboard/routes/bess.js/bess — storage operations: arbitrage revenue, capacity payments, degradation curves, cycling analysisJS
dashboard/routes/capital.js/capital — capital stack visualization, D/E sensitivity matrix, WACC analysis, cost of capital breakdownJS
dashboard/routes/carbon.js/carbon — credit generation projections, Verra pipeline status, forward contract analytics, pricing trendsJS
dashboard/routes/land.js/land — 440.68ha parcel metrics, agrivoltaic revenue, land lease NPV, dual-use analyticsJS
dashboard/routes/token.js/token — tokenization analytics, waterfall distributions, holder tracking, lockup countdown, yield metricsJS
📁

Data Room & Due Diligence

3 files
Institutional due diligence package — expanded checklists covering corporate, financial, technical, environmental, legal, regulatory, and land categories. JSON document index with status tracking. Ready for VDR (virtual data room) import for deal process.
FileDescriptionType
data-room/diligence-checklist.mdDiligence checklist — comprehensive due diligence items across all project dimensions, responsibility matrixMD
data-room/diligence-checklist-expanded.mdExpanded checklist — granular diligence items: permits, title searches, environmental studies, financial audits, engineering reports, insurance policiesMD
data-room/document-index.jsonDocument index — master JSON registry of all project documents with completion status, responsible party, target datesJSON
📐

Mermaid Architecture Diagrams

4 files
FileDescriptionType
diagrams/dr-capital-plumbing-map.mdDR capital plumbing map — end-to-end flow: sponsor → HoldCo → SPVs → project → revenue → waterfall → distributionsMD
diagrams/fideicomiso-workflow.mdFideicomiso workflow — SIMV trust creation → asset transfer → cashflow collection → distribution → reporting cycleMD
diagrams/green-bond-issuance-workflow.mdGreen bond issuance — mandate → structuring → SPO → marketing → pricing → settlement → reportingMD
diagrams/seven-year-timeline-exit.md7-year timeline — development → construction → COD → stabilization → operational → exit preparation → dispositionMD
📝

Documentation Indexes — 5 Categories

5 files
FileDescriptionType
docs/environmental/README.mdEnvironmental index — EIA, environmental licenses, monitoring plans, biodiversity assessments, water managementMD
docs/financial/README.mdFinancial documentation index — budgets, projections, term sheets, closing memos, audit reportsMD
docs/technical/README.mdTechnical documentation index — engineering specifications, grid studies, BESS documentation, panel specs, inverter dataMD
docs/land/README.mdLand documentation index — title certificates, cadastral surveys, appraisals, easements, environmental site assessmentsMD
docs/legal/README.mdLegal documentation index — corporate formation, project contracts, securities, multilateral complianceMD
🔐

Export & Audit Bundle

2 files
Deterministic audit export with SHA-256 hashing. Generates tamper-proof JSON bundles containing full project state, financial model outputs, covenant snapshots, and governance records. Used for lender reporting, regulatory submissions, and board packages.
FileDescriptionType
export/audit_bundle.jsAudit bundle generator — generateBundle() → JSON snapshot (meta + config + models + covenants + governance + data_room + capital + acquisition) · exportBundle() → .json + .sha256 · verifyBundle()JS
scripts/generate-report.jsReport generator — automated PDF/HTML report generation from financial model outputs, formatting, charts, executive summary compilationJS
📦

Source Documents — Permits, Titles, Engineering & Corporate Records

400 files across 7 categories
Complete primary source document archive supporting the shovel-ready status of the project. Includes satellite imagery, land title and no-superposition certifications, appraisals and surveys, official government permits and concession contracts, engineering designs (100MW + 140MW layouts with 3D renders), ETED interconnection approvals, and corporate registration records. All documents are version-controlled in the repository.

A — Satellite Imagery (18 files)

High-resolution satellite photographs and aerial imagery of the 440.68 ha project site at Baní, Peravia Province. Used for layout design, environmental baseline, and investor presentations.
FileDescriptionType
SunFarm Photovoltaica Project.jpgPrimary satellite view — complete project footprint, Baní DRIMG
SunFarm Photovoltaica Project-2.jpgSatellite view — zoomed boundary, access roadsIMG
SunFarm Photovoltaica Project-3.jpgSatellite view — terrain features, topographyIMG
SunFarm Photovoltaica Project-4.jpgSatellite view — adjacent infrastructure, road networkIMG
SunFarm Photovoltaica Project-5.jpgSatellite view — vegetation coverage, land use patternsIMG
SunFarm Photovoltaica Project-6.jpgSatellite view — region context, Galión areaIMG
SunFarm Photovoltaica Project-7.jpgSatellite view — wider area, municipal boundariesIMG
SunFarm Photovoltaica Project-8.jpgSatellite view — POI interconnection area, 138kV line routeIMG
SunFarm Photovoltaica Project-9.jpgSatellite view — overlay with boundary markersIMG
SunFarm Photovoltaica Project-10.jpgSatellite view — detail section of project areaIMG
SunFarm Photovoltaica Project-11.jpgSatellite view — northern section, boundary delineationIMG
SunFarm Photovoltaica Project-12.jpgSatellite view — southern section, drainage patternsIMG
1.pngSupplementary aerial — project overview image 1IMG
2.pngSupplementary aerial — project overview image 2IMG
3.pngSupplementary aerial — project overview image 3IMG
4.pngSupplementary aerial — project overview image 4IMG
5.pngSupplementary aerial — project overview image 5IMG
6.jpgSupplementary aerial — project overview image 6IMG

B — Title & No-Superposition Certification (2 files)

Official Dominican Republic land title and no-superposition certificates confirming clear, unencumbered ownership of Parcela 59 DC-8, Baní. Critical for lender security package and acquisition closing.
FileDescriptionType
PARCELA NO. 59 DC 8 BANI Land Title.pdfOfficial land title — Parcela No. 59, Distrito Catastral 8, Baní · Certificate No. 0500009639 · 440.68 hectares · Issued by Jurisdicción Inmobiliaria · Used for mortgage registration and security packagePDF TITLE
Certificacion de No Superposicion (Terreno Bani).pdfNo-superposition certification — confirms no overlapping land claims, liens, or competing titles on the Baní parcel. Required for lender comfort and title insurance qualificationPDF CERT

C — Land Appraisal & Survey (2 files)

Independent land appraisals and cadastral surveys establishing fair market value and precise boundaries. The 2025 appraisal (TASACIÓN) near Galión confirms the $47.9M valuation supporting the $35M acquisition discount.
FileDescriptionType
TASACION BAni Cerca de Galion 2025.pdf2025 land appraisal (TASACIÓN) — independent valuation near Galión, Baní · Establishes current FMV · Supports $35M acquisition pricing (26.9% discount to appraised $47.9M)PDF 2025
Bani survey sheet 2020.pdf2020 cadastral survey — boundary coordinates, area measurement (440.68 ha), topographic features, access points, neighboring parcelsPDF

D — Official Organized Permit Package (12 files)

Master organized document set — the complete permit stack in labeled sequence (A through K). Includes the CNE definitive concession, official concession contract, ETED interconnection no-objection, land title, no-superposition certification, LARED/TERRABLU executive summaries, and corporate registration data. This is the definitive shovel-ready evidence package.
FileDescriptionType
1-Listados Documentos.jpegDocument listing index — photographic record of master document inventoryIMG
A-CNE-CP-0012-2020 Sun Farmin Dominican Republic SRL 20 Abril 2020.pdfCNE DEFINITIVE CONCESSION — Concesión Provisional CNE-CP-0012-2020 granted April 20, 2020, for 50 MW solar PV generation. Issued by Comisión Nacional de Energía to Sun Farming Dominican Republic SRLPDF PERMIT
B-Carta a CNE 18-01-2024.pdfLetter to CNE — January 18, 2024 correspondence regarding concession renewal/continuation, regulatory engagement confirmationPDF
C-SNFRM Official Concesion Contract 2023.pdfOFFICIAL CONCESSION CONTRACT — Binding concession contract 2023 between CNE and Sunfarming Dom Rep Invest SRL · Full terms, obligations, performance targets, penalties, force majeure, governing lawPDF CONTRACT
D-No objeción ETED SF Feb 2024.pdfETED NO-OBJECTION — February 2024 · Empresa de Transmisión Eléctrica Dominicana confirms no-objection to interconnection at designated point of interconnection (138kV, 4.5km)PDF PERMIT
E-ETED Informe tecnico revalidacion May 2025.pdfETED REVALIDATION 2025 — Technical report for no-objection revalidation, May 2025 · Agro-energetic and innovative complex for generation · Updated grid impact study · Reconfirms POI viabilityPDF 2025
F-Certificacion de No Superposicion (Terreno Bani).pdfNo-superposition certification — confirms clean title with no overlapping claims on Baní parcelPDF
G-PARCELA NO. 59 DC 8 BANI Land Title.pdfLand title — Parcela No. 59 DC-8 Baní · 440.68 ha · Certificate 0500009639PDF
H-LARED Executive Summary PV Sunfarm Bani Final.pdfLARED executive summary — independent technical assessment of PV Sunfarm Baní project viability, yield analysis, resource assessmentPDF
I-LARED to TERRABLU Executive Summary PV Sunfarm Bani Final.pdfLARED→TERRABLU executive summary — comprehensive engineering viability report, irradiance analysis, energy yield projections, environmental screeningPDF
J-SUNFARMING DOM REP INVEST OpenCorporates.pdfOpenCorporates legal entity record — Sunfarming Dom Rep Invest SRL · RNC 1-31-94471-1 · Mercantil 158067-SD · Registered directors · Company status: activePDF
K-Sunfarming Food & Energy – Comisión Nacional de Energía.pdfCNE public registry listing — Sunfarming Food & Energy listed on Comisión Nacional de Energía website as registered energy concessionairePDF

E — Engineering Designs, Layouts & Technical Reports (32 files)

Complete engineering design package: final 140 MW layout with professional engineering drawings by Jairo Peña (161.5 MWac), 4 high-resolution 3D terrain visualizations, satellite area mapping with precise area measurements, 100 MW alternative design with Google Earth overlays, and independent technical reports. Designs demonstrate construction-ready engineering maturity.
FileDescriptionType
TOP-LEVEL REPORTS
Executive Summary PV Sunfarm Bani Final.pdfExecutive summary report — comprehensive PV project assessment, financial projections, technical specificationsPDF
Informe tecnico revalidacion No Objecion.pdfTechnical report for interconnection no-objection revalidation — agro-energetic and innovative generation complexPDF
PV-Heinsberg_1170-780.jpegSunfarming reference project — Heinsberg PV installation photograph, operational proof-of-conceptIMG
140 MW FINAL DESIGN — Professional Engineering Layout
140 Meg (Limpio).pngFinal 140 MW design — clean layout drawing showing panel array placement, inverter stations, substation location, access roadsIMG
Jairo Peña 161.5 MWac REP DOMINICANA-140 meg LAYOUT.pdfPROFESSIONAL ENGINEERING LAYOUT — 161.5 MWac detailed design by Jairo Peña · Complete engineering drawings · Panel arrays, combiner boxes, inverter pads, collection system, substation, T-line route · Construction-grade detail levelPDF ENGR
3D TERRAIN VISUALIZATION — 140 MW Design
Vistas Diseño 3d-1.png3D terrain render — perspective view 1, panel arrays on topographyIMG
Vistas Diseño 3d-2.png3D terrain render — perspective view 2, aerial angleIMG
Vistas Diseño 3d-3.png3D terrain render — perspective view 3, substation areaIMG
Vistas Diseño 3d-4.png3D terrain render — perspective view 4, complete project overviewIMG
SATELLITE AREA MAPS — Precise Area Measurement
Diseño 140 Mega (1,114,252 Mts2).pngSatellite map — 140 MW design area: 1,114,252 m² (111.4 ha) of active PV deployment footprintIMG
Diseño 140 Mega (1,114,252 Mts2)-B.pngSatellite map — alternate view of 140 MW layout with boundary overlayIMG
Diseño 140 Mega (1,114,252 Mts2)-C.pngSatellite map — 140 MW design area detail with grid overlayIMG
Area a Comprar Sugerida (1,300,016 Mts2).pngSuggested acquisition area — 1,300,016 m² (2,067.43 tareas) · Includes buffer zones, access corridors, and future expansionIMG
100 MW DESIGN PACKAGE — Alternative Layout
Jairo Peña REP DOMINICANA (99 MW)_LAYOUT.pdf99 MW engineering layout — professional design by Jairo Peña, alternative configuration for Phase 1PDF
Diseño Final Entregar a Bodden.pngFinal 100 MW design — clean delivery versionIMG
Final Pict.pngFinal picture — 100 MW design overview renderIMG
Foto Final Diseño Paneles Grupo Embajador.pngFinal panel design — Grupo Embajador area, panel array configurationIMG
GOOGLE EARTH OVERLAYS — 100 MW Terrain Design
Terreno diseñado sobre comprado.pngGoogle Earth — designed area overlaid on purchased parcel boundary, showing fitIMG
Terreno Firmado Compra.pngGoogle Earth — signed purchase area, contract boundaryIMG
todos.pngGoogle Earth — combined overlay, all parcels and design areas togetherIMG

F — Official Permits, Government Decrees & Corporate Records (21 files)

Complete government permits archive: multiple copies of CNE concessions (for redundancy/authenticity), official concession contract, ETED no-objection letters, Decreto 517-25, interconnection revalidation documents, CNE correspondence, OpenCorporates corporate registry data, and historical contract copies with site photographs.
FileDescriptionType
OFFICIAL PERMITS & DATA
CNE-CP-0012-2020 Sun Farmin Dominican Republic SRL.pdfCNE concession permit — definitive concession CNE-CP-0012-2020 for solar generationPDF PERMIT
official Concesion Contract.pdfOFFICIAL CONCESSION CONTRACT — binding agreement with CNE, all terms and conditionsPDF CONTRACT
Decreto 517-25.pdfGOVERNMENT DECREE 517-25 — presidential/governmental decree supporting project development framework and renewable energy deploymentPDF DECREE
No objeción ETED SF.pdfETED no-objection — original interconnection approval for Parque Solar SunfarmingPDF
Revalidación No Objeción Interconexión.pdfINTERCONNECTION REVALIDATION — updated 2025 revalidation of no-objection for grid interconnection at designated POIPDF 2025
Carta CNE 18-01-2024.pdfCNE correspondence — January 2024 letter regarding concession status and regulatory compliancePDF
Sunfarming Food & Energy – CNE.pdfCNE public registry — Sunfarming listing on Comisión Nacional de Energía official websitePDF
INTERCONNECTION REVALIDATION (NEW APPROVAL)
Informe técnico revalidación (Nueva Aprobación).pdfNew approval — technical report for interconnection no-objection revalidation, innovative agro-energetic generation complexPDF
Revalidación No Objeción (Nueva Aprobación).pdfUpdated revalidation — formal no-objection renewal for Parque Solar Sunfarming Food y Energy interconnectionPDF
CORPORATE DATA & HISTORICAL RECORDS
SUNFARMING DOM REP INVEST OpenCorporates.pdfOpenCorporates corporate record — entity status, registration details, directors, filing history, RNC verificationPDF
CNE-CP-0012-2020 (Corporate DATA copy).pdfCNE concession — corporate file copy for internal recordsPDF
Bani survey sheet 2020 (contract copy).pdfSurvey sheet — 2020 cadastral survey included with historical contract recordsPDF
PV-Heinsberg (contract copy).jpegSunfarming reference project — Heinsberg installation (historical file)IMG
PHOTO-2022-06-17 (1).jpgSite photograph — June 2022, project area documentationIMG
PHOTO-2022-06-17 (2).jpgSite photograph — June 2022, terrain features documentationIMG

G — Drone Survey & Orthomosaic Mapping (313 files) NEW 2025

Complete DJI drone survey of the 440.68 ha project site conducted September 11, 2025. Includes 302 high-resolution orthomosaic photographs (geo-tagged at 18.300858°N, 70.361325°W), KMZ flight mapping file, drone video footage, low-resolution reference videos, and SRT telemetry data with GPS coordinates, altitude, camera settings, and timestamps. Provides construction-grade aerial documentation of the entire site footprint.
FileDescriptionType
KMZ MAPPING FILE
6E20B66B-5FB4-45E7-ABDA-57334C216950.kmzKMZ flight mapping file — drone flight path, geofence boundary, waypoints. Opens in Google Earth / QGIS for precise geospatial analysis of survey coverageKMZ
ORTHOMOSAIC PHOTOGRAPHS — 302 High-Resolution Images
Orthomosaic-Photos/ (302 JPGs)302 DJI orthomosaic photographs — DJI_20250911134309_0030_D.JPG through DJI_20250911140112_0333_D.JPG · f/2.8, 140mm, ISO 110 · GPS-tagged · Altitude 31.5m relative / 122m absolute · Full site coverage for terrain analysis, vegetation mapping, and construction planningIMG×302
DRONE VIDEO & TELEMETRY
Tutorial sobre como subir fotos al Mapa.mp4Tutorial video — guide for uploading orthomosaic photos to mapping platformMP4
DJI_20250911134305_0030_D_s.MP4 + .LRF + .SRTDrone video flight 1 — full HD + low-res reference + SRT telemetry (GPS 18.300858°N, 70.361325°W, altitude data, timestamps)MP4+SRT
DJI_20250911135032_0031_D_s.MP4 + .LRF + .SRTDrone video flight 2 — continued survey coverage + telemetryMP4+SRT
DJI_20250911135738_0032_D_s.MP4 + .LRF + .SRTDrone video flight 3 — final survey pass + telemetry dataMP4+SRT